Business class new build. Актобе, р. Астана, мкр. 144Б, корпус 3
In brief: Developer: KazDorStroy NS; register status: completion date passed; completion Q2 2023; equity holder protection: local executive body (MIO / akimat) permit; register-based complex index 62/100 — developer 15.2/30, equity holder protection 25/25, timing and status 5/15, transparency 4/10 (excluding location).
In this selection: Completed complexes in Aktobe per the register (7)
Арайлы is a business-class residential complex by KazDorStroy NS in Aktobe, район Астана, мкр. 144Б, корпус 3. 14 storeys; structure: brick; facade: facing brick; ceilings 3.0 m. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in February 2018. The planned commissioning date per the registry is Q2 2023; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “local executive body (akimat) permit” scheme — the project is listed in the state shared-construction registry. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction. Guarantee (permit) number in the registry: 1. Authorized company (seller under the contracts): City Club Construction, BIN 180440017985. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Застройщик — KazDorStroy NS. Юридическое лицо по реестру долевого строительства: ТОО "KazDorStroy NS", БИН 080940000680. Договоры заключает уполномоченная компания City Club Construction (БИН 180440017985).
Housing class per the registry: business (class II under the registry classification). Building characteristics: 14 storeys; structure: brick; facade: facing brick; ceilings 3.0 m. Walls: brick.
Construction started in February 2018. Planned commissioning date per the registry: Q2 2023. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.
Shared construction is carried out under the “local executive body (akimat) permit” scheme — the project is listed in the state shared-construction registry. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 694). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.