Comfort-class new build. Uralsk, Baiterek district, Michurinskoye village, plot 1 B
In brief: Застройщик — Караванный путь; статус по реестру: срок ввода наступил; срок сдачи 4 кв. 2024; схема защиты дольщиков: Гарантия АО "КЖК"; индекс ЖК по реестру 66/100 — застройщик 15.7/30, защита дольщиков 25/25, сроки и статус 5/15, прозрачность 7/10 (без учёта локации).
In this selection: Completed complexes in Uralsk per the register (3)
Уркер is a comfort-class residential complex by Караванный путь in Uralsk, район Байтерек, с. Мичуринское, уч.1 Б. 2 buildings; 5 storeys; 6 entrances; structure: brick; facade: ceramic brick; ceilings 2.7 m. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in March 2024. The planned commissioning date per the registry is Q4 2024; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Grounds and facilities per the registry: 166 guest parking spaces in the courtyard; 1 playground; 1 sports ground. Accessibility: ramps, fold-down ramps on staircases. Shared construction is carried out under the “Kazakhstan Housing Company (KZhK) guarantee” scheme — the project is listed in the state shared-construction registry. A KZhK guarantee means that, if the developer runs into trouble, the Kazakhstan Housing Company guarantees completion of the building. Guarantee (permit) number in the registry: ДПГ-24-07-006/163. Cadastral number of the land plot: 08-118-097-1970. Authorized company (seller under the contracts): Уркер Строй, BIN 220340033735. Technical and design supervision: Developer Group. The Kazakhstan Housing Company publishes construction monitoring reports for this project. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Застройщик — Караванный путь. Юридическое лицо по реестру долевого строительства: ТОО "Караванный путь", БИН 030840007596. Договоры заключает уполномоченная компания Уркер Строй (БИН 220340033735).
Housing class per the registry: comfort (class III under the registry classification). Building characteristics: 2 buildings; 5 storeys; 6 entrances; structure: brick; facade: ceramic brick; ceilings 2.7 m. Walls: silicate brick.
Construction started in March 2024. Planned commissioning date per the registry: Q4 2024. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.
Shared construction is carried out under the “Kazakhstan Housing Company (KZhK) guarantee” scheme — the project is listed in the state shared-construction registry. A KZhK guarantee means that, if the developer runs into trouble, the Kazakhstan Housing Company guarantees completion of the building. Cadastral number of the land plot: 08-118-097-1970. Technical supervision: Developer Group. KZhK monitoring reports are available for this project.
Per the registry: 166 guest parking spaces in the courtyard; 1 playground; 1 sports ground.
Accessibility: ramps, fold-down ramps on staircases.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 872). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.