Standard class new development. Конаев, г. Конаев, мкр. 4, уч. № 62
In brief: Застройщик — KazSMU; статус по реестру: срок ввода наступил; срок сдачи 4 кв. 2023; схема защиты дольщиков: Гарантия АО "КЖК"; индекс ЖК по реестру 56/100 — застройщик 8/30, защита дольщиков 25/25, сроки и статус 5/15, прозрачность 7/10 (без учёта локации).
Sun City is a standard-class residential complex by KazSMU in Konaev, мкр. 4, уч. № 62. 3 buildings; 12 storeys; structure: monolithic; facade: extruded expanded polystyrene with acrylic impregnation, with subsequent render and paint facade paint; ceilings 3.0 m. The registry lists the complex as 3 phases (blocks), each with its own deadline and its own guarantee. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in June 2022. The planned commissioning date per the registry is Q4 2023; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “Kazakhstan Housing Company (KZhK) guarantee” scheme — the project is listed in the state shared-construction registry. A KZhK guarantee means that, if the developer runs into trouble, the Kazakhstan Housing Company guarantees completion of the building. Guarantee (permit) number in the registry: ДПГ-22-05-031/122 and 2 more. Cadastral number of the land plot: 03-055-001-545. Authorized company (seller under the contracts): JK Sun City, BIN 150 840 000 513. Technical and design supervision: Астана технадзор. The Kazakhstan Housing Company publishes construction monitoring reports for this project. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
The developer is KazSMU. Legal entity in the shared-construction registry: ТОО «KazSMU», BIN 970540007997. Contracts are concluded by the authorized company JK Sun City (BIN 150 840 000 513).
Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 3 buildings; 12 storeys; structure: monolithic; facade: extruded expanded polystyrene with acrylic impregnation, with subsequent render and paint facade paint; ceilings 3.0 m. Walls: monolithic reinforced concrete, with partial infill thermal blocks.
Строительство начато в июне 2022 года. Плановый срок ввода по реестру — IV квартал 2023 года. Плановый срок уже наступил, а акт ввода в реестре не отражён — факт приёмки уточняйте у застройщика. Сроки по очередям: ЖК "Sun City" (блок 2) — 10.10.2023; ЖК "Sun City" (блок 1) — 10.10.2023; ЖК "Sun City" (блок 3) — 10.10.2023.
Shared construction is carried out under the “Kazakhstan Housing Company (KZhK) guarantee” scheme — the project is listed in the state shared-construction registry. A KZhK guarantee means that, if the developer runs into trouble, the Kazakhstan Housing Company guarantees completion of the building. Cadastral number of the land plot: 03-055-001-545. Technical supervision: Астана технадзор. KZhK monitoring reports are available for this project.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 609, 666, 667). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.