KazSMU — developer: residential complexes, guarantees and completion dates from the state registerDeveloper KazSMU: 9 shared-equity projects in the state register (Almaty — 6, Konaev — 3), since 2021. BVU/KHC/MIO schemes 1/8/0, 14% of apartments sold, #37…
The score from 0 to 100 is made up of six components, each calculated solely from facts in the state register of shared-equity construction (homeportal.kz). Reviews, advertising and opinions are not taken into account. The equity holder protection schemes — BVU, KHC and MIO — are equally valid: all three are provided for by law, so the scheme does not affect the score. The weights are published so they can be discussed. Brands with a single project in the register are not ranked, as a score based on one building is unreliable.
| Component | Max. | Materials |
|---|---|---|
| Scale | 25 | Number of listings in the registry |
| Experience | 15 | years from the start of construction (8 years = maximum) |
| Registry deadlines | 20 | доля объектов с наступившим плановым сроком ввода; минус, если срок прошёл, а прогресс < 100 % |
| Demand | 20 | Sold-out rate according to registry data |
| Transparency | 12 | photos, residential complex website, and KZhK monitoring report |
| Supervision | 8 | Managed by an authorized or supervisory company |
| Penalty | -30% | The legal entity is on the official blacklist of unreliable developers. |
Reviews are subjective, so we look at facts from the state register of shared-equity construction. The Salemdom score based on register facts is 26.8 out of 100. 1 of 9 projects has bank participation, 8 with a KHC guarantee. There is 1 entry on the list of unscrupulous developers; all entries have been removed from the register.
9 shared-equity projects — 3 residential complexes (Almaty — 6, Konaev — 3). A project in the register is a separate phase or block with its own permit to raise equity holders' funds, so there are more projects than residential complexes.
According to the state register, KazSMU builds in 2 cities: Almaty — 6, Konaev — 3. In Almaty, most projects are in Zhetysu district — 2.
KazSMU's first project in the state register of shared-equity construction was started in 2021 — about 5 years ago. Only projects financed with equity holders' money are counted; buildings completed before the register existed or built with the developer's own funds are not included.
Salemdom has 3 KazSMU residential complexes: Maxima City (Almaty), Gul-Ana (Almaty), Sun City (Konaev). Each page shows register data, completion date, location and, where the developer has opened sales, apartment layouts and prices.
Nearest planned completion dates according to the register: Maxima City — July 2027. Dates are planned, taken from the permit to raise funds; the developer may extend them.
Of 9 projects with a completion date, 7 have already reached the planned date. The register shows 1 commissioning certificate; on time: 1. The register reflects certificates with a delay, so it is better to confirm the acceptance status of a specific building — leave a request on Salemdom and we will check.
According to the register, 1 KazSMU project has passed the planned completion date while construction readiness is below 100%. This lowers the deadlines score in the rating. Before buying in such a building, check whether the permit has been extended and which scheme protects equity holders' money.
According to the register: second-tier bank participation — 1 project, Kazakhstan Housing Company guarantee — 8, akimat permit — 0. With bank participation, equity holders' money goes through the bank under its control; a KHC guarantee means the building will be completed if the developer runs into problems; an akimat permit is issued after the building's frame is erected. All three schemes are provided for by law.
Yes: 1 of 9 KazSMU projects (11%) uses the second-tier bank scheme, compared with 61% on average across the register. The scheme is shown on each residential complex's page on Salemdom, in the 'Guarantees' section.
According to the register, the developer has 484 apartments, of which 66 sold — 14%. Sales data is available for 4 of 9 projects; sell-through is filled in by the developer itself, so the figures may lag behind.
KazSMU does not yet have an open catalog of apartments with prices on Salemdom. Leave a request on Salemdom and a broker will confirm availability, prices and installment or mortgage terms for the residential complex you need.
Yes: 1 entry in the official blacklist of unreliable developers on homeportal.kz, although all records have since been cleared. This reduces the rating score by 30 and requires extra caution during the transaction.
37th place in Kazakhstan's developer rating by sales: 66 apartments sold in total across all KazSMU projects in the state register of shared-equity construction. The rating counts only the number of apartments sold — no reviews and no advertising. Separately, based on register facts (scale, experience, deadlines, demand, transparency, oversight), KazSMU has a Salemdom score of 26.8 out of 100.
KazSMU's strongest rating components: oversight — 8 out of 8, register deadlines — 14.8 out of 20. Weakest: demand — 2.7 out of 20, scale — 12.5 out of 25. Each component is calculated from register facts; the score formula is open on the rating page.
In Almaty, 25 developers have projects in the register; by rating score, KazSMU ranks 22nd among them. The top is BI Group (77.5). KazSMU has 6 projects in Almaty.
According to the register, construction photos are available for 100% of KazSMU projects, a residential complex website for 44%, and a Kazakhstan Housing Company monitoring report for 67%. The more open materials a project has, the easier it is to check actual construction progress.
An authorized or supervisory company is listed in the register for 100% of KazSMU projects. For 8 projects with a KHC guarantee, construction progress is additionally checked by the Kazakhstan Housing Company. For 1 project with bank participation, equity holders' money is controlled by the bank.
KazSMU LLP (BIN 970540007997). Projects of one brand are often registered to different LLPs — before the deal, check the BIN in the contract against the register.
By number of apartments in the register — Maxima City (Almaty): 484 apartments, planned completion — July 2027.
Find the project in the register of shared-equity construction and check three things: the seller's BIN in the contract matches the developer's BIN in the register, the funds protection scheme (bank participation, KHC guarantee or akimat permit), and the planned completion date. On Salemdom, this is collected in the 'Guarantees' section of each KazSMU residential complex; it also shows whether there is an entry in the list of unscrupulous developers.
Choose a residential complex and an apartment on Salemdom and submit a request. A Salemdom broker will confirm availability and the current price, compare mortgage programs, and assist you with the transaction. Buy an apartment with a Salemdom broker and receive a double mattress as a gift.
From the state register of shared-equity construction (homeportal.kz): project cards, protection schemes, deadlines, sales and the list of unscrupulous developers. The register is re-read at least once a week; the latest export was on October 12, 2026. Apartment prices come from the catalogs of developers connected to Salemdom.
37th place в in the Kazakhstan developer sales ranking: 66 apartments sold in total according to the state register.
| Month | Sold | Net change | New objects | Overview |
|---|---|---|---|---|
| September 2026 | 1 | +1 | 1 | digest |
| August 2026 | 0 | 0 | 1 | digest |
| July 2026 | 0 | 0 | 0 | digest |