House 113

Standard class new development. Костанай, г. Костанай, мкр. Береке, уч. №5

In brief: Developer: BK-STROY; register status: completion date has passed; completion Q1 2021; equity holder protection scheme: second-tier bank (BVU) participation; 126 apartments per the register; register index 66/100 — developer 20/30, equity holder protection 25/25, timing and status 5/15, transparency 3/10 (location not included).

In this selection: Completed residential complexes in Kostanay per the register (26)

Дом 113 is a standard-class residential complex by БК-СТРОЙ in Kostanay, мкр. Береке, уч. №5. 2 entrances; structure: brick; facade: ceramic facing brick; ceilings 2.7 m. According to the registry, the complex has 126 apartments: 1-room — 54 (35 m²–39.6 m²), 2-room — 54 (50.1 m²–54.8 m²), 3-room — 18 (69.8 m²). The developer has not filled in sales data in the registry. Apartment finish per the registry: turnkey finish. Construction started in April 2020. The planned commissioning date per the registry is Q1 2021; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Grounds and facilities per the registry: 1 playground; passenger lifts — 1. Accessibility: ramps, fold-down ramps on staircases. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 18. Authorized company (seller under the contracts): БК-Инвест 113, BIN 200440005759. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.

FAQs

Who is the developer of Дом 113?

Застройщик — БК-СТРОЙ. Юридическое лицо по реестру долевого строительства: ТОО "БК-СТРОЙ", БИН 031040001233. Договоры заключает уполномоченная компания БК-Инвест 113 (БИН 200440005759).

What class is Дом 113, and what are its buildings like?

Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 2 entrances; structure: brick; facade: ceramic facing brick; ceilings 2.7 m. Walls: ceramic brick. Apartment finish: turnkey finish.

When will Дом 113 be completed, and what is its status?

Construction started in April 2020. Planned commissioning date per the registry: Q1 2021. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.

How many apartments does Дом 113 have, and what are the layouts?

Per the registry, the complex has 126 apartments: 1-room — 54, 2-room — 54, 3-room — 18. Sizes: 1-room from 35 m² to 39.6 m², 2-room from 50.1 m² to 54.8 m², 3-room from 69.8 m².

How many apartments in Дом 113 have been sold?

The developer has not filled in sales data in the registry (it shows zero), so we do not show or assess the sell-out rate.

How is buyers' money protected in Дом 113?

Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.

Is there parking at Дом 113, and what is in the courtyard?

Per the registry: 1 playground; passenger lifts — 1.

How accessible is Дом 113 for residents with limited mobility?

Accessibility: ramps, fold-down ramps on staircases. Lifts: 1 passenger.

Can I buy an apartment in Дом 113 on Salemdom?

The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.

Where can I check Дом 113 in the state registry?

The project's records are on the homeportal.kz portal (shared-construction registry, ID 213). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.

Kostanay new-build market news

Other residential complexes by BK-STROY in Kostanay

Nearby residential complexes

More new builds in Kostanay

View registry data, specifications and photos →