October 2026 in Yesil District, Astana: 2 projects received a permit to attract buyers’ funds — 542 apartments. Developers, addresses, classes, room mix, areas and commissioning dates per the KHC registry.
In October 2026, 2 projects with 542 apartments entered the shared construction registry in Yesil District, Astana. All new projects went on sale from developer BI Group.
The projects differ in their characteristics. Bosaga 2 belongs to the economy class (class IV), while Jetisu Bereke is compact housing. Both use the BVU protection scheme. Planned commissioning dates range from January 2028 to September 2028. By room count in the new projects, 1-room apartments account for 42 %, 3-room — 26 %, 2-room — 25 %, 4-room — 6 %.
At the sales start, a buyer is advised to check the KHC registry data. It is important to review the project address, commissioning dates, housing class and actual room mix. It is also worth paying attention to the technical supervision and the authorized company assigned to each building.
Commentary prepared by Salemdom AI strictly from the issue's figures.
In October 2026, 2 projects with 542 apartments entered the shared construction registry in Yesil District, Astana. For a buyer, this is the start of official sales: with a permit to attract funds, a developer can sign shared participation agreements during construction.
Schemes: BVU — 2. All new projects are from developer BI Group. Planned commissioning dates — from January 2028 to September 2028.
| Residential complex | Developer | Scheme | Apartments | Scheduled completion |
|---|---|---|---|---|
| Bosaga 2 | BI Group | BVU | 294 | September 2028 |
| Jetisu Bereke | BI Group | BVU | 248 | January 2028 |
In the new projects in Yesil District, Astana: 1-room — 42 %, 3-room — 26 %, 2-room — 25 %, 4-room — 6 % of apartments.
Bosaga 2 is a new project by developer BI Group, Yesil District, Astana. Registry address: Yesil district, E 117 St.. The permit to attract buyers’ funds was issued on 5 October 2026, construction started on 1 September 2026, planned commissioning — September 2028.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — economy (class IV). Floors — 1, 9, 1 building, 8 entrances. Structure — frame, walls — aerated concrete blocks, facade — aluminium composite panels, clinker panels.
Apartments — 294: 1-room — 93 (34,97–37,15 m²), 2-room — 90 (46,49–68,67 m²), 3-room — 86 (67,91–94,05 m²), 4-room — 25 (94,6–126,34 m²). Ceilings — 3,0 m. Finish — rough (shell). Parking spaces — 173. As of 31 October 2026, 72 apartments are already marked as sold in the registry.
Technical supervision — LLP “Engineering Services”, authorized company — LLP “SAPAPROEKT”.
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | BVU |
| Class | Economy class |
| Apartments | 294 |
| Permit | October 5, 2026 |
| Scheduled completion | September 2028 |
Jetisu Bereke is a new project by developer BI Group, Yesil District, Astana. Registry address: Yesil district, E 511 St., plot 36. The permit to attract buyers’ funds was issued on 30 September 2026, construction started on 20 August 2026, planned commissioning — January 2028.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — compact housing. Floors — 1, 9, 1 building, 6 entrances. Structure — combined, walls — expanded clay concrete, facade — aluminium composite panels.
Apartments — 248: 1-room — 136 (34,38–45,49 m²), 2-room — 48 (52,75–63,48 m²), 3-room — 56 (68,38–95,65 m²), 4-room — 8 (114,61–134,13 m²). Ceilings — 2,65 m. Finish — rough (shell). Parking spaces — 62. As of 31 October 2026, 141 apartments are already marked as sold in the registry.
Technical supervision is provided by Engineering Services LLP; the authorized company is MX-ENGINEERING LLP.
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | BVU |
| Class | Compact |
| Apartments | 248 |
| Permit | September 30, 2026 |
| Scheduled completion | January 2028 |
2 projects with 542 apartments: Bosaga 2 (BI Group), Jetisu Bereke (BI Group).
The project has received approval from the local executive body to attract investment from homebuyers and has been entered into the KHC shared-construction registry. The developer may now officially sell apartments during the construction phase via shared participation agreements.
Bosaga 2 — BVU; Jetisu Bereke — BVU. With bank participation, buyers’ funds pass through the bank; a KHC guarantee means the building is completed if the developer runs into problems; an akimat permit is issued after the building’s frame is erected. All three schemes are provided for by law.
Earliest planned date — Jetisu Bereke, January 2028. Bosaga 2 — September 2028; Jetisu Bereke — January 2028. The dates are planned; the developer may extend them.
The widest selection of layouts is typically available at the start of sales. Submit a request on Salemdom, and a broker will confirm availability and pricing, vet the developer and protection schemes via the registry, and assist you with your mortgage. Get a free double mattress when you purchase an apartment through a Salemdom broker.
From the shared-construction registry of Kazakhstan Housing Company (KHC): projects that were not in the snapshot as of 30 September 2026 and appeared by 31 October 2026. Characteristics are taken from the project cards in the registry.
Nura District, Astana · Sarayshyq district of Astana · Baikonyr district of Astana · Saryarka district of Astana