Июль 2026 в районе Нура Астаны: 4 объекта получили разрешение на привлечение денег дольщиков — 1 101 квартира. Застройщики, адреса, классы, комнатность, площади и сроки ввода по госреестру.
In July 2026, 4 new projects totaling 1,101 apartments were added to the shared construction register in Astana's Nura district. Sales have launched for developers NAK, BI Group, Stroy Opt, and BAZIS-A, with NAK offering the highest number of apartments among the new launches.
The properties differ by their protection schemes: 2 use BVUs and 2 use KZHK. Available listings include economy class (Class IV) and studio apartments. In terms of layout, two-bedroom apartments predominate at 42%, followed by one-bedroom at 31% and three-bedroom at 27%. Scheduled completion dates range from April 2027 to November 2027.
When purchasing during the initial sales phase, it is important for buyers to verify the state registry data. We recommend paying close attention to the wall construction type, ceiling height, and the type of finishing. You should also review the information regarding the technical supervision and the authorized company assigned to each property.
Commentary prepared by Salemdom AI strictly from the issue's figures.
За июль 2026 в реестр долевого строительства в районе Нура Астаны вошло 4 объекта на 1 101 квартира. Для покупателя это старт официальных продаж: с разрешением на привлечение денег застройщик может заключать договоры долевого участия на этапе стройки.
Payment plans: 2 via banks, 2 via KZHK. There are 4 developers, with NAK offering the most apartments. Estimated completion dates range from April 2027 to November 2027.
| ЖК | Developer | Scheme | Apartments | Scheduled completion |
|---|---|---|---|---|
| Dala Jusan (blocks 3, 4) | NAK | БВУ | 444 | July 2027 |
| UIA. DARYN - H | BI Group | БВУ | 282 | April 2027 |
| OZAT | Stroy Opt | КЖК | 204 | November 2027 |
| FORTIS (plot 34) | BAZIS-A | КЖК | 171 | August 2027 |
In new developments in Astana's Nura district, two-bedroom apartments make up 42%, one-bedroom 31%, and three-bedroom 27% of the units.
Dala Jusan (plots 3, 4) is a new development by NAK located in the Nura district of Astana. Registered address: Esil river, Tole Bi st., plot 10. The permit to attract equity holder funds was issued on May 20, 2026; construction began on December 15, 2025, with completion scheduled for July 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed via the bank). Registry class — economy (Class IV). Storeys — 9, 2 buildings, 13 entrances. Construction — frameless, walls — brick, facade — fiber cement panels.
Total apartments — 444: 1-bedroom — 161 (29.82–76.32 m²), 2-bedroom — 139 (51.2–60.03 m²), 3-bedroom — 144 (36.82–78.83 m²). Ceiling height — 3.0 m. Finishing — pre-finish. Passenger elevators — 5. Parking spaces — 122.
Технический надзор — ТОО "TRUST QURYLYS KZ", уполномоченная компания — ТОО "ТОRТАY еnginеering Co.".
| Parameter | Value |
|---|---|
| Developer | NAK |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 444 |
| Permit | May 20, 2026 |
| Scheduled completion | July 2027 |
UIA. DARYN - H is a new development by BI Group, located in the Nura district of Astana. Official registry address: Nura river, Uly Dala Ave, plot 6. The permit to attract shared construction funding was issued on July 3, 2026; construction began on June 22, 2026, with scheduled completion in April 2027.
Shareholder protection scheme — second-tier bank participation (funds are managed via the bank). Registry classification — small-sized housing. Floors — 9 and 12; 1 building, 7 entrances. Structure — frame, walls — foam concrete blocks, facade — aluminum composite panels.
Total apartments — 282: 1-bedroom — 22 (37.61–37.69 m²), 2-bedroom — 159 (42.39–58.82 m²), 3-bedroom — 101 (64.71–125.04 m²). Ceiling height — 2.7 m. Finish — shell and core. Passenger elevators — 4. As of July 31, 2026, 104 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО MX-ENGINEERING.
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Compact |
| Apartments | 282 |
| Permit | July 3, 2026 |
| Scheduled completion | April 2027 |
OZAT is a new development by Stroy Opt, located in the Nura district of Astana. Registered address: Nura district, Korgalzhyn Highway, plot 40B. The permit to attract equity holder funds was issued on July 15, 2026; construction began on May 19, 2026, with scheduled completion in November 2027.
Shared equity protection scheme — guaranteed by the Kazakhstan Housing Company (completion guarantee in case of developer default). Registry class — economy (Class IV). Height — 5 stories, 1 building, 11 entrances. Construction — frame, walls — foam-gas concrete blocks, facade — fiber cement panels.
Total apartments — 204: 1-bedroom — 82 (34.31–48.89 m²), 2-bedroom — 106 (49.92–74.25 m²), 3-bedroom — 16 (56.48–93.43 m²). Ceiling height — 2.7 m. Finishing — shell and core. Passenger elevators — 1.
Технический надзор — ТОО "AstAsGroup", уполномоченная компания — ТОО "Астана Эксперт Групп".
| Parameter | Value |
|---|---|
| Developer | Stroy Opt |
| Scheme | КЖК |
| Class | Economy class |
| Apartments | 204 |
| Permit | July 15, 2026 |
| Scheduled completion | November 2027 |
FORTIS (plot 34) is a new project by developer BAZIS-A, located in the Nura district, Astana. Registered address: Nura district, intersection of streets №E22, E51, E102, and Hussein bin Talal. The permit to attract equity funding was issued on June 13, 2025, construction began on June 3, 2026, with scheduled completion in August 2027.
Equity holder protection scheme — guarantee from the Kazakhstan Housing Company (completion guarantee in case of developer issues). Registry class — economy (Class IV). Floors — 20, 1 building, 1 entrance. Structure — frame, walls — foam concrete blocks, facade — fiber cement board.
Total apartments — 171: 1-bedroom — 76 (38–40.5 m²), 2-bedroom — 57 (52–57.7 m²), 3-bedroom — 38 (74.9–78.8 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 3.
Технический надзор — ТОО "Трансмонтаж сервис КЗ", уполномоченная компания — ТОО "DP Engineering Group".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | КЖК |
| Class | Economy class |
| Apartments | 171 |
| Permit | June 13, 2025 |
| Scheduled completion | August 2027 |
4 объекта на 1 101 квартира: Dala Jusan (пятна 3, 4) (NAK), UIA. DARYN - H (BI Group), OZAT (Stroy Opt), FORTIS (пятно 34) (BAZIS-A).
The project has received approval from the local executive body to attract investment from homebuyers and has been entered into the state register of shared construction. The developer may now officially sell apartments during the construction phase via shared participation agreements.
Dala Jusan (plots 3, 4) — BVU; UIA. DARYN - H — BVU; OZAT — KHC; FORTIS (plot 34) — KHC. With bank participation, buyers' money goes through the bank; a KHC guarantee means the building is completed if the developer runs into trouble; an akimat permit is issued once the building's frame is up. All three schemes are provided for by law.
The earliest estimated completion date is UIA. DARYN - H in April 2027. Dala Jusan (plots 3, 4) — July 2027; UIA. DARYN - H — April 2027; OZAT — November 2027; FORTIS (plot 34) — August 2027. These are scheduled dates and may be subject to extension by the developer.
The widest selection of layouts is typically available at the start of sales. Submit a request on Salemdom, and a broker will confirm availability and pricing, vet the developer and protection schemes via the registry, and assist you with your mortgage. Get a free double mattress when you purchase an apartment through a Salemdom broker.
From the state register of shared construction (homeportal.kz): properties that were not present in the July 4, 2026 snapshot and appeared by July 31, 2026. Characteristics are taken from the property cards in the register.
Yesil district of Astana · Sarayshyq district of Astana · Baikonyr district of Astana · Saryarka district of Astana