Июль 2026 в Казахстане: 12 объектов получили разрешение на привлечение денег дольщиков — 2 952 квартиры. Застройщики, адреса, классы, комнатность, площади и сроки ввода по госреестру.
In July 2026, 12 projects comprising 2,952 apartments were added to Kazakhstan's shared construction registry. Sales launched for 9 developers, including BI Group, BAZIS-A, NAK, ULYTAU Group, Свой Дом, Stroy Opt, Orda Invest, Ситеко, and ЖК Теремки. BI Group brought the highest number of apartments to the market.
The properties consist primarily of Class IV and small-sized housing. In terms of layout, two-bedroom (36%) and one-bedroom (32%) apartments predominate, followed by three-bedroom (26%) and four-bedroom (6%) units. The security schemes are distributed as follows: BVU — 7, KZhK — 3, MIO — 2. Scheduled completion dates range from November 2026 to May 2028.
At the start of sales, buyers should verify the permit for attracting equity holder funds and the chosen protection scheme. We recommend checking the state registry for completion deadlines, wall construction types, and finishing options. It is also worth reviewing the technical supervision company and the authorized organization responsible for the project's construction.
Commentary prepared by Salemdom AI strictly from the issue's figures.
За июль 2026 в реестр долевого строительства в Казахстане вошло 12 объектов на 2 952 квартиры. Для покупателя это старт официальных продаж: с разрешением на привлечение денег застройщик может заключать договоры долевого участия на этапе стройки.
Financing schemes: 7 via banks (BVU), 2 via local executive bodies (MIO), and 3 via housing construction savings banks (KZhK). There are 9 developers, with BI Group offering the most apartments. Scheduled completion dates range from November 2026 to May 2028.
| ЖК | Developer | Scheme | Apartments | Scheduled completion |
|---|---|---|---|---|
| Saulet 3 | BI Group | БВУ | 469 | May 2028 |
| Dala Jusan (blocks 3, 4) | NAK | БВУ | 444 | July 2027 |
| Shakarim Avenue | ULYTAU Group | МИО | 418 | November 2026 |
| ALTER (Plot 9) | BAZIS-A | БВУ | 362 | June 2027 |
| UIA. DARYN - H | BI Group | БВУ | 282 | April 2027 |
| ANSAR | My Home | БВУ | 266 | December 2027 |
| OZAT | Stroy Opt | КЖК | 204 | November 2027 |
| FORTIS (plot 34) | BAZIS-A | КЖК | 171 | August 2027 |
| Livento | Orda Invest | МИО | 120 | May 2027 |
| MAVERICK (Phase 4) | BAZIS-A | БВУ | 90 | November 2027 |
| JAGALAU | Siteco | КЖК | 66 | December 2026 |
| VERTEX GARDEN | Qazaq Stroy | БВУ | 60 | December 2026 |
In new developments across Kazakhstan, two-bedroom apartments make up 36%, one-bedroom 32%, three-bedroom 26%, and four-bedroom 6% of all units.
| Developer | Properties | Apartments |
|---|---|---|
| BI Group | 2 | 751 |
| BAZIS-A | 3 | 623 |
| NAK | 1 | 444 |
| ULYTAU Group | 1 | 418 |
| My Home | 1 | 266 |
| Stroy Opt | 1 | 204 |
| Orda Invest | 1 | 120 |
| Siteco | 1 | 66 |
| Qazaq Stroy | 1 | 60 |
Saulet 3 is a new development by BI Group, located in the Zhetysu district of Almaty. Registered address: Zhetysu district, Raiymbek Avenue, plot 219B. The permit to attract equity holder funding was issued on June 24, 2026; construction began on June 10, 2026, with completion scheduled for May 2028.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed through the bank). Registry class — economy (Class IV). Number of floors — 7-8-9, 1 building, 13 entrances. Structure — frame, walls — aerated concrete blocks, facade — aluminum composite panels, HPL panels, clinker brick.
Apartments — 469: 1-bedroom — 148 (27.58–47.45 m²), 2-bedroom — 151 (43.23–62.9 m²), 3-bedroom — 116 (66.5–94.6 m²), 4-bedroom — 54 (105.64–111.96 m²). Ceiling height — 2.7 m. Finish — improved shell and core. As of July 31, 2026, 33 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО «АтлантСтройгрупп».
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 469 |
| Permit | June 24, 2026 |
| Scheduled completion | May 2028 |
Dala Jusan (plots 3, 4) is a new development by NAK located in the Nura district of Astana. Registered address: Esil river, Tole Bi st., plot 10. The permit to attract equity holder funds was issued on May 20, 2026; construction began on December 15, 2025, with completion scheduled for July 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed via the bank). Registry class — economy (Class IV). Storeys — 9, 2 buildings, 13 entrances. Construction — frameless, walls — brick, facade — fiber cement panels.
Total apartments — 444: 1-bedroom — 161 (29.82–76.32 m²), 2-bedroom — 139 (51.2–60.03 m²), 3-bedroom — 144 (36.82–78.83 m²). Ceiling height — 3.0 m. Finishing — pre-finish. Passenger elevators — 5. Parking spaces — 122.
Технический надзор — ТОО "TRUST QURYLYS KZ", уполномоченная компания — ТОО "ТОRТАY еnginеering Co.".
| Parameter | Value |
|---|---|
| Developer | NAK |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 444 |
| Permit | May 20, 2026 |
| Scheduled completion | July 2027 |
Shakarim Avenue — новый объект застройщика ULYTAU Group, Сарыаркинский район, Астана. Адрес по реестру: район Нұра, улица Е 882, д. 9/1. Разрешение на привлечение денег дольщиков выдано 9 июля 2026, строительство начато 17 декабря 2025, плановый ввод — ноябрь 2026.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: economy (class IV). Floors: 9, 14, 17; 1 building, 7 entrances. Structure: frame; walls: foam and aerated concrete blocks; facade: clinker brick, fiber cement panels.
Total apartments — 418: 1-bedroom — 117 (40.19–46.43 m²), 2-bedroom — 88 (49.89–73.78 m²), 3-bedroom — 161 (52.29–126.9 m²), 4-bedroom — 52 (112.93–180.31 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 1. Parking spaces — 209.
Технический надзор — ТОО "AstAsGroup", уполномоченная компания — ТОО "БизнесСтройХолдинг".
| Parameter | Value |
|---|---|
| Developer | ULYTAU Group |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 418 |
| Permit | July 9, 2026 |
| Scheduled completion | November 2026 |
ALTER (пятно 9) — новый объект застройщика BAZIS-A, район Сарайшық, Астана. Адрес по реестру: р. Сарайшық, прсч. ул. А. Байтұрсынұлы, К. Әзірбаева и 23-16. Разрешение на привлечение денег дольщиков выдано 29 июня 2026, строительство начато 8 июня 2026, плановый ввод — июнь 2027.
Equity holder protection scheme — second-tier bank participation (funds are processed through the bank). Registry class — economy (Class IV). Building details — 9 stories, 1 building, 6 entrances. Structure — frame, walls — thermal block, facade — aluminum composite panels.
Total apartments — 362: 1-bedroom — 186 (35.4–47.4 m²), 2-bedroom — 126 (37.25–73.6 m²), 3-bedroom — 50 (37.25–87.2 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 6. Parking spaces — 93.
Технический надзор — ТОО "Демеу Строй Консалтинг", уполномоченная компания — ТОО "АВС Проект ЛТД".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 362 |
| Permit | June 29, 2026 |
| Scheduled completion | June 2027 |
UIA. DARYN - H is a new development by BI Group, located in the Nura district of Astana. Official registry address: Nura river, Uly Dala Ave, plot 6. The permit to attract shared construction funding was issued on July 3, 2026; construction began on June 22, 2026, with scheduled completion in April 2027.
Shareholder protection scheme — second-tier bank participation (funds are managed via the bank). Registry classification — small-sized housing. Floors — 9 and 12; 1 building, 7 entrances. Structure — frame, walls — foam concrete blocks, facade — aluminum composite panels.
Total apartments — 282: 1-bedroom — 22 (37.61–37.69 m²), 2-bedroom — 159 (42.39–58.82 m²), 3-bedroom — 101 (64.71–125.04 m²). Ceiling height — 2.7 m. Finish — shell and core. Passenger elevators — 4. As of July 31, 2026, 104 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО MX-ENGINEERING.
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Compact |
| Apartments | 282 |
| Permit | July 3, 2026 |
| Scheduled completion | April 2027 |
ANSAR is a new development by Svoi Dom, located in the Zhetysu district of Almaty. Registered address: 27 Panfilov St., Zhetysu district. The permit for attracting equity holder funds was issued on June 30, 2026, construction began on June 19, 2026, and the scheduled completion date is December 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are processed through the bank). Registry class — economy (Class IV). Building details — 9 stories, 5 buildings, 5 entrances per building. Construction — wall system, walls — foam-gas concrete blocks, facade — composite panels.
Total apartments — 266: 1-bedroom — 108 (40.74–45.35 m²), 2-bedroom — 106 (46.56–78.87 m²), 3-bedroom — 32 (77.25–104.04 m²), 4-bedroom — 20 (109.33–141.02 m²). Ceiling height — 3.0 m. Finishing — improved shell and core. As of July 31, 2026, 1 apartment is marked as sold in the registry.
Технический надзор — ТОО "СИТИСТРОЙТЕХ", уполномоченная компания — ТОО «CORPUS PRO».
| Parameter | Value |
|---|---|
| Developer | My Home |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 266 |
| Permit | June 30, 2026 |
| Scheduled completion | December 2027 |
OZAT is a new development by Stroy Opt, located in the Nura district of Astana. Registered address: Nura district, Korgalzhyn Highway, plot 40B. The permit to attract equity holder funds was issued on July 15, 2026; construction began on May 19, 2026, with scheduled completion in November 2027.
Shared equity protection scheme — guaranteed by the Kazakhstan Housing Company (completion guarantee in case of developer default). Registry class — economy (Class IV). Height — 5 stories, 1 building, 11 entrances. Construction — frame, walls — foam-gas concrete blocks, facade — fiber cement panels.
Total apartments — 204: 1-bedroom — 82 (34.31–48.89 m²), 2-bedroom — 106 (49.92–74.25 m²), 3-bedroom — 16 (56.48–93.43 m²). Ceiling height — 2.7 m. Finishing — shell and core. Passenger elevators — 1.
Технический надзор — ТОО "AstAsGroup", уполномоченная компания — ТОО "Астана Эксперт Групп".
| Parameter | Value |
|---|---|
| Developer | Stroy Opt |
| Scheme | КЖК |
| Class | Economy class |
| Apartments | 204 |
| Permit | July 15, 2026 |
| Scheduled completion | November 2027 |
FORTIS (plot 34) is a new project by developer BAZIS-A, located in the Nura district, Astana. Registered address: Nura district, intersection of streets №E22, E51, E102, and Hussein bin Talal. The permit to attract equity funding was issued on June 13, 2025, construction began on June 3, 2026, with scheduled completion in August 2027.
Equity holder protection scheme — guarantee from the Kazakhstan Housing Company (completion guarantee in case of developer issues). Registry class — economy (Class IV). Floors — 20, 1 building, 1 entrance. Structure — frame, walls — foam concrete blocks, facade — fiber cement board.
Total apartments — 171: 1-bedroom — 76 (38–40.5 m²), 2-bedroom — 57 (52–57.7 m²), 3-bedroom — 38 (74.9–78.8 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 3.
Технический надзор — ТОО "Трансмонтаж сервис КЗ", уполномоченная компания — ТОО "DP Engineering Group".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | КЖК |
| Class | Economy class |
| Apartments | 171 |
| Permit | June 13, 2025 |
| Scheduled completion | August 2027 |
Livento — новый объект застройщика Orda Invest, Байконырский район, Астана. Адрес по реестру: район Байқоңыр, улица Иманова, д. 24. Разрешение на привлечение денег дольщиков выдано 13 июля 2026, строительство начато 26 июня 2026, плановый ввод — май 2027.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: compact (compact housing). Floors: 9, 12; 1 building, 3 entrances. Structure: frame; walls: aerated concrete blocks; facade: aluminum composite panels, clinker panels.
120 apartments: 11 one-bedroom (41.58–42.24 m²), 49 two-bedroom (46.54–69.56 m²), 49 three-bedroom (61.7–95.17 m²), and 11 four-bedroom (93.09–93.57 m²). Ceiling height: 3.0 m. Finish: pre-finishing. Passenger elevators: 1. Parking spaces: 63.
Технический надзор — ТОО "Трансмонтаж сервис КЗ", уполномоченная компания — ВАСТОК про ЖШС.
| Parameter | Value |
|---|---|
| Developer | Orda Invest |
| Scheme | МИО |
| Class | Compact |
| Apartments | 120 |
| Permit | July 13, 2026 |
| Scheduled completion | May 2027 |
MAVERICK (Block 4) is a new development by BAZIS-A, located in the Yesil district of Astana. Registered address: Esil River, intersecting streets E542, E548, E550, E552, and E555. The permit to attract shared construction funding was issued on June 18, 2026; construction began on November 14, 2025, with scheduled completion in November 2027.
Equity holder protection scheme — participation of a second-tier bank (funds are managed via the bank). Registry class — economy (Class IV). Storeys — 4, 1 building, 9 entrances. Structure — frame, walls — foam-gas concrete blocks, facade — porcelain stoneware.
90 apartments: 30 two-bedroom (62.5–67.3 m²), 30 three-bedroom (102–105.1 m²), and 30 four-bedroom (126.8–135.9 m²). Ceiling height — 3.3 m. Finishing — shell and core. Passenger elevators — 1. Parking spaces — 100.
Технический надзор — ТОО "AVERTI GROUP", уполномоченная компания — ТОО "ЛидерСтройGroup".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 90 |
| Permit | June 18, 2026 |
| Scheduled completion | November 2027 |
JAGALAU is a new development by Siteko, Semey. Registered address: 3/1 Irtyshskaya St. The permit to attract equity funding was issued on June 3, 2026, construction began on December 31, 2025, and completion is scheduled for December 2026.
Equity holder protection scheme — guaranteed by the Kazakhstan Housing Company (completion guarantee in case of developer default). Registry class — economy (Class IV). Storeys — 12, 1 building, 1 entrance. Structure — frame, walls — brick, facade — fiber cement panels.
66 Apartments: 22 one-bedroom (40.25–42.24 m²), 33 two-bedroom (59.62–61.73 m²), and 11 three-bedroom (97.78–97.78 m²). Ceiling height: 3.0 m. Finishing: shell and core. Passenger elevators: 1. As of July 31, 2026, 5 apartments are already marked as sold in the register.
Technical supervision is provided by TEKHNOLOGIYA KACHESTVA LLP; the authorized company is NSS Project LLP.
| Parameter | Value |
|---|---|
| Developer | Siteco |
| Scheme | КЖК |
| Class | Economy class |
| Apartments | 66 |
| Permit | June 3, 2026 |
| Scheduled completion | December 2026 |
VERTEX GARDEN — новый объект застройщика Qazaq Stroy, Медеуский район, Алматы. Адрес по реестру: Медеуский район, микрорайон Кок-Тобе, улица Талгат Бигелдинов,, д. 138. Разрешение на привлечение денег дольщиков выдано 3 апреля 2026, строительство начато 11 марта 2026, плановый ввод — декабрь 2026.
Shareholder protection scheme — involvement of a second-tier bank (shareholder funds are managed through the bank). Registry class — economy (Class IV). Height — 5 stories, 2 buildings, 4 entrances. Construction — wall system, walls — reinforced concrete, facade — clinker brick, porcelain stoneware.
60 apartments: 6 one-bedroom (49.28–53.49 m²), 20 two-bedroom (71.43–79.73 m²), 26 three-bedroom (86.4–104.11 m²), and 8 four-bedroom (109.87–127.28 m²). Ceiling height: 3.0 m. Finishing: shell and core. Passenger elevators: 2.
Технический надзор — ТОО "Техстандарт KZ", уполномоченная компания — ИП "Архитектор Сергей Фартуков".
| Parameter | Value |
|---|---|
| Developer | Qazaq Stroy |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 60 |
| Permit | April 3, 2026 |
| Scheduled completion | December 2026 |
12 объектов на 2 952 квартиры: Saulet 3 (BI Group), Dala Jusan (пятна 3, 4) (NAK), Shakarim Avenue (ULYTAU Group), ALTER (пятно 9) (BAZIS-A), UIA. DARYN - H (BI Group), ANSAR (Свой Дом), OZAT (Stroy Opt), FORTIS (пятно 34) (BAZIS-A) и другие.
The project has received approval from the local executive body to attract investment from homebuyers and has been entered into the state register of shared construction. The developer may now officially sell apartments during the construction phase via shared participation agreements.
Saulet 3: BVU; Dala Jusan (plots 3, 4): BVU; Shakarim Avenue: MIO; ALTER (plot 9): BVU; UIA. DARYN - H: BVU; ANSAR: BVU; OZAT: KHC; FORTIS (plot 34): KHC; Livento: MIO; MAVERICK (block 4): BVU. With bank participation, money passes through the bank; a KHC guarantee means the project will be completed if the developer runs into trouble; an akimat permit is issued after the building frame is erected. All three schemes are provided for by law.
The earliest scheduled completion date is Shakarim Avenue in November 2026. Saulet 3 — May 2028; Dala Jusan (plots 3, 4) — July 2027; Shakarim Avenue — November 2026; ALTER (plot 9) — June 2027; UIA. DARYN - H — April 2027; ANSAR — December 2027. These dates are tentative and subject to extension by the developer.
The widest selection of layouts is typically available at the start of sales. Submit a request on Salemdom, and a broker will confirm availability and pricing, vet the developer and protection schemes via the registry, and assist you with your mortgage. Get a free double mattress when you purchase an apartment through a Salemdom broker.
From the state register of shared construction (homeportal.kz): properties that were not present in the July 4, 2026 snapshot and appeared by July 31, 2026. Characteristics are taken from the property cards in the register.