Сентябрь 2026 в Казахстане: 28 объектов получили разрешение на привлечение денег дольщиков — 6 878 квартир. Застройщики, адреса, классы, комнатность, площади и сроки ввода по госреестру.
In September 2026, 28 projects totaling 6,878 apartments were added to Kazakhstan's shared construction registry. Sales launched for 14 developers, with BI Group offering the highest number of apartments. Other companies on the list include BAZIS-A, Каспий Құрылыс ЛТД, БК-СТРОЙ, and others.
Properties vary by protection schemes: BVU — 19, MIO — 5, KZhK — 4. Two-bedroom apartments are the most common (41 %), followed by one-bedroom (26 %) and three-bedroom (22 %). Scheduled completion dates range widely, from September 2026 to August 2031. New launches include both economy (Class IV) and business (Class II) developments.
At the start of sales, buyers should verify that the developer has the necessary permit to attract equity holder funds in the state register. It is recommended to review the specific rights protection scheme, the projected completion date, and the building's technical specifications, including the construction type and finishes.
Commentary prepared by Salemdom AI strictly from the issue's figures.
За сентябрь 2026 в реестр долевого строительства в Казахстане вошло 28 объектов на 6 878 квартир. Для покупателя это старт официальных продаж: с разрешением на привлечение денег застройщик может заключать договоры долевого участия на этапе стройки.
Funding schemes: KZhK — 4, BVU — 19, MIO — 5. There are 14 developers, with BI Group offering the most apartments. Scheduled completion dates range from September 2026 to August 2031.
In new developments across Kazakhstan, two-bedroom apartments make up 41%, one-bedroom 26%, three-bedroom 22%, four-bedroom 9%, and five or more bedrooms 1% of all units.
| Developer | Properties | Apartments |
|---|---|---|
| BI Group | 9 | 2 507 |
| BAZIS-A | 6 | 1 154 |
| Kaspii Kurylis LTD | 1 | 765 |
| БК-СТРОЙ | 1 | 676 |
| Comfort Telman | 1 | 510 |
| OKSD | 2 | 298 |
| TUMAR Group | 1 | 253 |
| BR BUILDING | 1 | 189 |
| My Home | 1 | 180 |
| Adal Stroy Snab | 1 | 136 |
| Atamura Group | 1 | 67 |
| KazSMU | 1 | 50 |
| Alim Stroy Service | 1 | 48 |
| Stroy Group Prime | 1 | 45 |
JM City Dom-Park is a new development by Kaspi Kurylis LTD, located in the Nura district of Astana. Registered address: Nura district, Turan Ave, 78/2. The permit to attract shared construction funding was issued on July 3, 2024; construction began on February 15, 2021, with completion scheduled for December 2026.
Equity holder protection scheme — guaranteed by the Kazakhstan Housing Company (completion guarantee in case of developer default). Registry class — Business (Class II). Floors — 16, 1 building, 15 entrances. Structure — frame, walls — aerated concrete blocks, facade — porcelain stoneware and fiber cement panels.
Total apartments — 765: 1-bedroom — 44 (56.1–58.26 m²), 2-bedroom — 387 (75.07–84.91 m²), 3-bedroom — 156 (93.25–102.4 m²), 4-bedroom — 163 (115.01–125.93 m²), 5+ bedroom — 15 (149.46–191.17 m²). Ceiling height — 3.0 m. Finishing — pre-finish. Parking spaces — 765. As of September 30, 2026, 206 apartments have already been marked as sold in the registry.
Технический надзор — ТОО "ИНЖИНИРИНГОВАЯ КОМПАНИЯ "ЛИДЕР", уполномоченная компания — ТОО "ORTA".
| Parameter | Value |
|---|---|
| Developer | Kaspii Kurylis LTD |
| Scheme | КЖК |
| Class | Business class |
| Apartments | 765 |
| Permit | July 3, 2024 |
| Scheduled completion | December 2026 |
Yubileyny Residential Complex (Phase 134-135) is a new project by developer BK-STROY in Kostanay. Registered address: PK Yubileyny St., plot 14A. The permit to attract shared construction funding was issued on October 7, 2026, construction began on September 23, 2026, with scheduled completion in August 2028.
Equity holder protection scheme — involvement of a second-tier bank (funds are processed through the bank). Registry class — economy (Class IV). Storeys — 12, 1 building, 20 entrances. Construction — frame, walls — aerated concrete blocks, facade — ceramic panels.
Total apartments — 676: 1-bedroom — 89 (23.47–41.88 m²), 2-bedroom — 393 (41.95–53.16 m²), 3-bedroom — 161 (72.55–101.65 m²), 4-bedroom — 33 (97.29–102.63 m²). Ceiling height — 2.7 m. Finishing — shell and core. Passenger elevators — 10. Parking spaces — 324.
Технический надзор — ТОО "Технадзор-Строй и К", уполномоченная компания — ТОО "БК-СТРОЙ".
| Parameter | Value |
|---|---|
| Developer | БК-СТРОЙ |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 676 |
| Permit | October 7, 2026 |
| Scheduled completion | August 2028 |
Family Nest G is a new project by developer BI Group, located in the Yesil district of Astana. Registered address: Yesil river, Al-Farabi Ave, plot 73. The permit to attract equity funding was issued on September 16, 2026, construction began on July 16, 2026, and completion is scheduled for January 2028.
Equity holder protection scheme: participation of a second-tier bank (funds are processed through the bank). Registry class: economy (Class IV). Storeys: 1, 2, 9; 1 building, 13 entrances. Structure: frame; walls: foam-gas concrete blocks; facade: aluminum composite panels, clinker brick.
Total apartments — 534: 1-bedroom — 125 (28.62–39.94 m²), 2-bedroom — 275 (34.51–68.12 m²), 3-bedroom — 86 (66.94–90.15 m²), 4-bedroom — 48 (94.63–135.42 m²). Ceiling height — 3.0 m. Finishing — shell and core. Parking spaces — 370. As of September 30, 2026, 183 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "PRIME DESIGN".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 534 |
| Permit | September 16, 2026 |
| Scheduled completion | January 2028 |
Aiva is a new development by Comfort Telman, located in the Sarayshyq district of Astana. Registered address: Almaty rd., A108 st., plot 12. The permit to attract equity funding was issued on September 16, 2026; construction began on July 27, 2026, with completion scheduled for June 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed through the bank). Registry class — economy (Class IV). Height — 5 and 9 stories, 1 building, 12 entrances. Structure — frame, walls — aerated concrete blocks, facade — fiber cement panels.
Apartments — 510: 1-bedroom — 213 (33.53–41.07 m²), 2-bedroom — 137 (43.65–77.69 m²), 3-bedroom — 160 (63.33–91.33 m²). Ceiling height — 2.7 m. Finish — shell and core. Passenger elevators — 12. Parking spaces — 248.
Technical supervision is provided by AI-Company NC LLP; the authorized company is PROJECT PLUS STROY LLP.
| Parameter | Value |
|---|---|
| Developer | Comfort Telman |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 510 |
| Permit | September 16, 2026 |
| Scheduled completion | June 2027 |
MERIDIAN 1 — новый объект застройщика BI Group, Каратауский район, Шымкент. Адрес по реестру: р. Каратау, мкр. Нуртас, ул. Жасыл Желек, уч. 4. Разрешение на привлечение денег дольщиков выдано 24 сентября 2026, строительство начато 7 сентября 2026, плановый ввод — июль 2028.
Shared equity protection scheme — second-tier bank participation (funds are managed through the bank). Registry class — economy (Class IV). Height — 16 stories, 1 building, 7 entrances. Structure — frameless, walls — foam-gas concrete blocks, facade — aluminum composite panels.
Total apartments — 454: 1-bedroom — 136 (36.23–47.94 m²), 2-bedroom — 164 (45.57–62.89 m²), 3-bedroom — 126 (67.28–91.8 m²), 4-bedroom — 28 (113.83–142.33 m²). Ceiling height — 3.0 m. Finish — improved shell and core. Passenger elevators — 1. Parking spaces — 132. As of September 30, 2026, 28 apartments are already marked as sold in the registry.
Технический надзор — ТОО "ИНВЕКОН ИНЖИНИРИНГ", уполномоченная компания — ТОО "INTEH KZ".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 454 |
| Permit | September 24, 2026 |
| Scheduled completion | July 2028 |
TAULAN (plots 31-33) is a new development by BAZIS-A, located in the Almaly district of Almaty. Registered address: Almaly district, Rayimbek Ave, 210A. The permit to attract equity funding was issued on March 4, 2026; construction began on December 15, 2025, with scheduled completion in August 2031.
Shareholder protection scheme: involvement of a second-tier bank (funds are processed through the bank). Registry class: economy (Class IV). Floors: 15; 3 buildings, 3 entrances. Structure: frame; walls: foam-gas concrete blocks; facade: aluminum composite panels.
Total apartments — 420: 1-bedroom — 168 (37.6–45.2 m²), 2-bedroom — 210 (49.1–61.1 m²), 3-bedroom — 42 (73.7–75.7 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 2. As of September 30, 2026, 30 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "СКПБ Алматы Энергопроект".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 420 |
| Permit | March 4, 2026 |
| Scheduled completion | August 2031 |
LAVITA.CITY A is a new development by BI Group, located in the Esil district of Astana. Registered address: Esil river, E 826 st., plot 2/1. The permit to attract equity funding was issued on September 10, 2026, construction began on July 23, 2026, and completion is scheduled for July 2027.
Equity holder protection scheme — second-tier bank participation (funds are processed through the bank). Registry class — economy (Class IV). Floors — 2, 9, 1 building, 12 entrances. Construction — frame, walls — foam concrete blocks, facade — fiber cement board.
Total apartments — 381: 1-bedroom — 107 (38.08–45.28 m²), 2-bedroom — 121 (44.44–67.49 m²), 3-bedroom — 107 (66.88–106.54 m²), 4-bedroom — 46 (105.99–122.67 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 11. Parking spaces — 254. As of September 30, 2026, 40 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "Проект Инновация".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 381 |
| Permit | September 10, 2026 |
| Scheduled completion | July 2027 |
LAVITA City-B-1 is a new development by BI Group, located in the Yesil district of Astana. Registered address: Yesil River, E 826 St, plot 2. The permit to attract equity funding was issued on September 10, 2026, construction began on July 29, 2026, with completion scheduled for November 2027.
Shareholder protection scheme: second-tier bank participation (funds are managed via the bank). Registry class: economy (Class IV). Building specifications: 9 stories, 1 building, 8 entrances. Construction: frame; walls: foam-gas concrete blocks; facade: aluminum composite panels.
Total apartments — 290: 1-bedroom — 100 (31.49–48.82 m²), 2-bedroom — 121 (44.34–66.19 m²), 3-bedroom — 61 (68.57–80.48 m²), 4-bedroom — 8 (89.64–93.11 m²). Ceiling height — 3.0 m. Finishing — shell and core. Parking spaces — 155.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "ТОRТАY еnginеering Co.".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 290 |
| Permit | September 10, 2026 |
| Scheduled completion | November 2027 |
Riverland - 1 is a new development by BI Group located in the Saryarka district of Astana. Registered address: Saryarka district, E. Serkebaev St., plot 29/1. The permit to attract equity funding was issued on September 10, 2026, construction began on August 11, 2026, and completion is scheduled for June 2027.
Shareholder protection scheme — involvement of a second-tier bank (shareholder funds are processed through the bank). Registry class — small-sized housing. Floors — 4, 9, 12; 1 building, 4 entrances. Structure — frame, walls — foam concrete blocks, facade — aluminum composite panels, ceramic brick.
Total apartments — 284: 1-bedroom — 67 (28.4–36.41 m²), 2-bedroom — 120 (33.57–55.53 m²), 3-bedroom — 63 (63.18–85.14 m²), 4-bedroom — 34 (93.57–123.21 m²). Ceiling height — 2.7 m. Finish — shell and core. Passenger elevators — 7. As of September 30, 2026, 74 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ИП "ADN Эксперт".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Compact |
| Apartments | 284 |
| Permit | September 10, 2026 |
| Scheduled completion | June 2027 |
Uly Dala Park is a new development by TUMAR Group, located in the Nura district of Astana. Registered address: Nura river, E 908 st., plot 22. The permit to attract equity funding was issued on September 16, 2026, construction began on December 31, 2025, and completion is scheduled for October 2027.
Shareholder protection scheme: participation of a second-tier bank (funds are managed via the bank). Registry class: economy (Class IV). Floors: 9, 1; 1 building, 8 entrances. Structure: frame; walls: brick; facade: fiber cement board.
Total apartments — 253: 1-bedroom — 68 (38.05–41.92 m²), 2-bedroom — 95 (49.29–72.18 m²), 3-bedroom — 58 (74.1–92.01 m²), 4-bedroom — 32 (108.98–113.13 m²). Ceiling height — 3.0 m. Finish — shell and core. Parking spaces — 93.
Технический надзор — ТОО "Adal Engineering KZ", уполномоченная компания — ТОО "ОЮ PROJECT GROUP".
| Parameter | Value |
|---|---|
| Developer | TUMAR Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 253 |
| Permit | September 16, 2026 |
| Scheduled completion | October 2027 |
Arena City Sport H — новый объект застройщика BI Group, Алатауский район, Алматы. Адрес по реестру: р. Алатау, мкр. Акмаржан, уч. 25. Разрешение на привлечение денег дольщиков выдано 31 августа 2026, строительство начато 5 августа 2026, плановый ввод — июль 2028.
Equity holder protection scheme: involvement of a second-tier bank (funds are managed through the bank). Registry class: small-sized housing. Storeys: 6, 1 building, 9 entrances. Construction: wall system; walls: foam-gas concrete blocks; facade: clinker brick, cement plaster, acrylic plaster.
Total apartments — 235: 1-bedroom — 35 (28.72–37.06 m²), 2-bedroom — 95 (40.99–57.48 m²), 3-bedroom — 70 (52.91–94.03 m²), 4-bedroom — 35 (110.66–118.96 m²). Ceiling height — 2.7 m. Finishing — improved shell and core. As of September 30, 2026, 15 apartments are already marked as sold in the registry.
Технический надзор — ТОО "ASM Gold", уполномоченная компания — ТОО "BuildControl".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Compact |
| Apartments | 235 |
| Permit | August 31, 2026 |
| Scheduled completion | July 2028 |
Nexpo Grand is a new project by developer BI Group, located in the Yesil district of Astana. Registered address: Yesil district, T. Ryskulov St, plot 4. The permit to attract equity funding was issued on July 13, 2026, construction began on May 25, 2026, and completion is scheduled for January 2028.
Equity holder protection scheme: involvement of a second-tier bank (funds are managed via the bank). Registry class: business (Class II). Number of floors: 9, 18, 20; 1 building, 4 entrances. Construction: frame, walls: aerated concrete blocks, facade: fiber cement panels.
Total apartments — 202: 2-bedroom — 64 (53.83–84.5 m²), 3-bedroom — 70 (108.05–126.72 m²), 4-bedroom — 50 (148.54–174.36 m²), 5+ bedroom — 18 (181.83–270.59 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 8. Parking spaces — 682. As of September 30, 2026, 18 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "SAULET-4".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Business class |
| Apartments | 202 |
| Permit | July 13, 2026 |
| Scheduled completion | January 2028 |
Alatau Life is a new development by BR BUILDING, located in the Nura district of Astana. Registered address: Nura district, E 435 street, 1/1, plot. The permit to attract equity funding was issued on July 28, 2026, construction began on July 15, 2026, and completion is scheduled for December 2027.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: economy (class IV). Floors: 9; 5 buildings, 6 entrances. Structure: frame; walls: aerated concrete blocks; facade: aluminum composite panels.
Total apartments — 189: 1-bedroom — 76 (37.68–44.53 m²), 2-bedroom — 57 (60.46–71.81 m²), 3-bedroom — 56 (88.66–103.01 m²). Ceiling height — 3.0 m. Finishing — pre-finish, improved shell and core. Parking spaces — 23.
Технический надзор — ТОО "TechnoService KZ", уполномоченная компания — Абжаннов Аскербек Ердикулович.
| Parameter | Value |
|---|---|
| Developer | BR BUILDING |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 189 |
| Permit | July 28, 2026 |
| Scheduled completion | December 2027 |
Prestizh (Sparkle Diamond) is a new project by the developer OKSD in Ust-Kamenogorsk. Address in the register: 19th residential district, at the intersection of Yu. Uvaliev Street and Kokzhal Barak Street. The permit to raise buyers' funds was issued on May 10, 2024, construction began on February 27, 2026, and planned completion is November 2026.
Buyer protection scheme: Kazakhstan Housing Company guarantee (the building is completed if the developer runs into trouble). Register class: comfort (class III). Floors: 5; 1 building, 6 entrances. Structure: load-bearing walls; walls: brick; facade: fiber cement panels.
Total apartments — 186: 1-bedroom — 19 (50.12–58.72 m²), 2-bedroom — 39 (56.62–79.82 m²), 3-bedroom — 26 (87.32–115.14 m²), 4-bedroom — 9 (145.37–145.74 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 6. Parking spaces — 56. As of September 30, 2026, 106 apartments are already marked as sold in the register.
Технический надзор — ТОО «Steppeeaglekz», уполномоченная компания — ТОО "AB project company".
| Parameter | Value |
|---|---|
| Developer | OKSD |
| Scheme | КЖК |
| Class | Comfort Class |
| Apartments | 186 |
| Permit | May 10, 2024 |
| Scheduled completion | November 2026 |
Zamandas is a new development by Svoy Dom, located in the Auezov district of Almaty. Registered address: Auezov district, Navoi St., 4. The permit to attract equity holder funds was issued on September 15, 2026; construction began on June 1, 2026, with scheduled completion in January 2028.
Equity holder protection scheme — second-tier bank participation (funds are managed via the bank). Registry class — economy (Class IV). Floors — 9; 4 buildings, 4 entrances. Construction — wall system; walls — reinforced concrete; facade — composite panels.
Total apartments — 180: 1-bedroom — 58 (37.73–45.14 m²), 2-bedroom — 72 (46.12–73.34 m²), 3-bedroom — 33 (76–99.62 m²), 4-bedroom — 17 (125.64–126.99 m²). Ceiling height — 3.0 m. Finishing — improved shell and core. Passenger elevators — 1.
Технический надзор — ТОО "СИТИСТРОЙТЕХ", уполномоченная компания — ТОО «Графен».
| Parameter | Value |
|---|---|
| Developer | My Home |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 180 |
| Permit | September 15, 2026 |
| Scheduled completion | January 2028 |
Aspen is a new development by BAZIS-A, located in the Yesil district of Astana. Registered address: Yesil River, E810 St, plot 2B. The permit for attracting equity holder funds was issued on September 16, 2026; construction began on June 16, 2026, with scheduled completion in January 2028.
Equity holder protection scheme — involvement of a second-tier bank (funds are processed through the bank). Registry class — economy (Class IV). Height — 6 stories, 1 building, 5 entrances. Construction — frame, walls — aerated concrete blocks, facade — composite and clinker panels.
165 apartments: 65 one-bedroom (36.13–38.72 m²), 70 two-bedroom (53.29–56.2 m²), and 30 three-bedroom (51.34–74.69 m²). Ceiling height — 2.85 m. Finishing — shell and core. 5 passenger elevators.
Технический надзор — ТОО "Трансмонтаж сервис КЗ", уполномоченная компания — ИП «ALDO».
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 165 |
| Permit | September 16, 2026 |
| Scheduled completion | January 2028 |
NURLY DALA 2 (plots 43, 44) is a new project by developer BAZIS-A, located in the Nauryzbay district of Almaty. Registered address: Nauryzbay district, Raiymbek Ave, plot 590/22. The permit to attract equity funding was issued on May 15, 2026, construction began on November 18, 2025, and completion is scheduled for March 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed via the bank). Registry class — economy (Class IV). Floor count — 9, 2 buildings, 2 entrances. Structure — frame, walls — foam-gas concrete blocks, facade — cement plaster.
Total apartments — 162: 1-bedroom — 110 (33.3–39.7 m²), 2-bedroom — 34 (52.8–53.6 m²), 3-bedroom — 18 (58.4–59.3 m²). Ceiling height — 2.62 m. Finishing — shell and core. Passenger elevators — 2.
Технический надзор — ТОО "KazBuildExpert", уполномоченная компания — ТОО "DP Engineering Group".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 162 |
| Permit | May 15, 2026 |
| Scheduled completion | March 2027 |
NURLY DALA 2 (plots 45, 46) is a new development by BAZIS-A, located in the Nauryzbay district of Almaty. Registered address: Nauryzbay district, Raiymbek Ave, plot 590/23. The permit to attract shared construction funding was issued on May 15, 2026; construction began on November 18, 2025, with scheduled completion in July 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed via the bank). Registry class — economy (Class IV). Floor count — 9, 2 buildings, 2 entrances. Structure — frame, walls — foam-gas concrete blocks, facade — cement plaster.
Total apartments — 144: 96 one-bedroom (33.3–39.7 m²), 32 two-bedroom (52.9–54.1 m²), and 16 three-bedroom (58.5–59.4 m²). Ceiling height — 2.62 m. Finishing — shell and core. Passenger elevators — 1.
Технический надзор — ТОО "KazBuildExpert", уполномоченная компания — ТОО "DP Engineering Group".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 144 |
| Permit | May 15, 2026 |
| Scheduled completion | July 2027 |
NURLY DALA 2 (plots 47, 48) is a new project by developer BAZIS-A, located in the Nauryzbay district of Almaty. Registered address: Nauryzbay district, Raiymbek Ave, plot 590/23. The permit to attract equity funding was issued on May 15, 2026, construction began on November 18, 2025, and completion is scheduled for July 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed via the bank). Registry class — economy (Class IV). Floor count — 9, 2 buildings, 2 entrances. Structure — frame, walls — foam-gas concrete blocks, facade — cement plaster.
Total apartments — 144: 96 one-bedroom (33.3–39.7 m²), 32 two-bedroom (52.9–54.1 m²), and 16 three-bedroom (58.5–59.4 m²). Ceiling height — 2.62 m. Finishing — shell and core. Passenger elevators — 1.
Технический надзор — ТОО "KazBuildExpert", уполномоченная компания — ТОО "DP Engineering Group".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 144 |
| Permit | May 15, 2026 |
| Scheduled completion | July 2027 |
ARISTOCRAT is a new project by developer Adal Stroy Snab in Konaev. Registered address: 16/4 D.A. Kunaev Ave. The permit to attract shared construction funding was issued on June 18, 2026, construction began on December 23, 2025, with completion scheduled for October 2026.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: comfort (class III). Floors: 5; 4 buildings, 6 entrances. Structure: load-bearing walls; walls: aerated concrete blocks; facade: fiber cement panels.
Total apartments — 136: 1-bedroom — 37 (40–40 m²), 2-bedroom — 78 (46–71 m²), 3-bedroom — 21 (53–71 m²). Ceiling height — 3.1 m. Finish — shell and core. Passenger elevators — 1.
Технический надзор — TOO «ALIHAN CONSTRUCTION», уполномоченная компания — ТОО "GAL Partners".
| Parameter | Value |
|---|---|
| Developer | Adal Stroy Snab |
| Scheme | МИО |
| Class | Comfort Class |
| Apartments | 136 |
| Permit | June 18, 2026 |
| Scheduled completion | October 2026 |
Aston Park (Plot 2) is a new development by BAZIS-A, located in the Yesil district of Astana. Registered address: Yesil river, E 669 st., plot 34. The permit to attract equity funding was issued on September 18, 2026, construction began on November 14, 2025, with scheduled completion in November 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed via the bank). Registry class — economy (Class IV). Storeys — 4; 1 building, 9 entrances. Construction — frame, walls — aerated concrete blocks, facade — natural stone.
Total apartments — 119: 2-bedroom — 44 (53.92–87.47 m²), 3-bedroom — 32 (115.38–136.23 m²), 4-bedroom — 40 (102.61–168.96 m²), 5+ bedroom — 3 (142.4–177.4 m²). Ceiling height — 3.3 m. Finishing — shell and core. Passenger elevators — 9. Parking spaces — 110.
Технический надзор — ТОО «ТамерланТехСервис», уполномоченная компания — ТОО "ЛидерСтройGroup".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 119 |
| Permit | September 18, 2026 |
| Scheduled completion | November 2027 |
Asyl Mura (Asyl Tas) — новый объект застройщика OKSD, Шымкент. Адрес по реестру: р. Каратау, мкр. Нуртас, д. 5/3. Разрешение на привлечение денег дольщиков выдано 6 марта 2023, строительство начато 25 декабря 2025, плановый ввод — сентябрь 2026.
Equity holder protection scheme — guarantee by the Kazakhstan Housing Company (completion guarantee in case of developer issues). Registry class — comfort (Class III). Height — 5 stories, 1 building, 10 entrances. Structure — frame, walls — foam-gas concrete blocks, facade — fiber cement panels.
Total apartments — 112: 1-bedroom — 51 (38.99–49.27 m²), 2-bedroom — 50 (55.42–77.64 m²), 3-bedroom — 11 (80.54–88.34 m²). Ceiling height — 2.7 m. Finishing — shell and core. Passenger elevators — 6. As of September 30, 2026, 78 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Экспертно-техническое бюро", уполномоченная компания — ТОО "AB project company".
| Parameter | Value |
|---|---|
| Developer | OKSD |
| Scheme | КЖК |
| Class | Comfort Class |
| Apartments | 112 |
| Permit | March 6, 2023 |
| Scheduled completion | September 2026 |
Tamga Hills is a new development by BI Group, located in the Yesil district of Astana. Registered address: Yesil River, E 117 St, plot 54. The permit for equity funding was issued on June 9, 2026, construction began on December 16, 2025, and completion is scheduled for November 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed through the bank). Registry classification — economy (Class IV). Storeys — 5, 1 building, 8 entrances. Structure — frame, walls — aerated concrete blocks, facade — aluminum composite panels.
Total apartments — 95: 2-bedroom — 15 (66.97–96.49 m²), 3-bedroom — 51 (91.9–166.44 m²), 4-bedroom — 29 (148.07–176.79 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 8. Parking spaces — 69. As of September 30, 2026, 1 apartment is marked as sold in the register.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО «Astana Megapolis Project».
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 95 |
| Permit | June 9, 2026 |
| Scheduled completion | November 2027 |
Aqsai Resort (Phase 1) is a new development by Atamura Group located in the Karasay district. Registered address: Karasay district, Kyrgauyldy village. The permit to attract shared construction funding was issued on August 21, 2026; construction began on December 30, 2025, with scheduled completion in December 2029.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: economy (class IV). Floors: 2; 1 building, 8 entrances. Structure: combined; walls: aerated concrete blocks; facade: fiber cement board.
67 apartments: 39 four-room units (153–153 m²), 28 five+ room units (168–168 m²). Ceiling height: 3.3 m. Finish: shell and core.
Технический надзор — ТОО "Экспертно-техническое бюро", уполномоченная компания — ТОО "Инновация".
| Parameter | Value |
|---|---|
| Developer | Atamura Group |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 67 |
| Permit | August 21, 2026 |
| Scheduled completion | December 2029 |
Maxima City (plot 2) is a new development by KazSMU located in the Zhetysu district of Almaty. Registered address: Zhetysu district, Botkina St., plot 1/1. The permit to attract equity funding was issued on August 21, 2026; construction began on July 29, 2026, with completion scheduled for July 2027.
Equity holder protection scheme — guaranteed by the Kazakhstan Housing Company (completion guarantee in case of developer default). Registry class — economy (Class IV). Storeys — 7, 3 buildings, 2 entrances. Construction — frameless, walls — reinforced concrete, facade — fiber cement panels.
Total apartments — 50: 1-bedroom — 22 (34.8–43.57 m²), 2-bedroom — 22 (56.73–62.18 m²), 3-bedroom — 6 (88.13–88.13 m²). Ceiling height — 2.7 m. Finishing — shell and core. Passenger elevators — 1. As of September 30, 2026, 3 apartments are already marked as sold in the registry.
Technical supervision — BATYR-SAPA KZ, authorized company — TOO ArchSpecStroyProject.
| Parameter | Value |
|---|---|
| Developer | KazSMU |
| Scheme | КЖК |
| Class | Economy class |
| Apartments | 50 |
| Permit | August 21, 2026 |
| Scheduled completion | July 2027 |
Miras is a new development by Alim Stroy Servis in Semey. Registered address: 102 Nekrasova St. The permit to attract shared construction funding was issued on September 8, 2026; construction began on December 10, 2025, with scheduled completion in June 2027.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: comfort (class III). Floors: 5; 1 building, 3 entrances. Structure: load-bearing walls; walls: brick; facade: asbestos-cement sheets.
48 apartments: 27 two-bedroom (49.3–75.5 m²), 9 three-bedroom (102.9–102.9 m²), and 12 four-bedroom (125.6–125.6 m²). Ceiling height: 3.0 m. Finishing: shell and core. 2 passenger elevators. 38 parking spaces.
Технический надзор — ТОО "TEKHNADZOR CONTROL KZ", уполномоченная компания — ТОО "SAPAPROEKT".
| Parameter | Value |
|---|---|
| Developer | Alim Stroy Service |
| Scheme | МИО |
| Class | Comfort Class |
| Apartments | 48 |
| Permit | September 8, 2026 |
| Scheduled completion | June 2027 |
Orken City is a new development by Stroy Group Prime in Konaev. Registered address: Almaty region, Konaev city, district 10, plot 2. The permit to attract equity holder funding was issued on September 16, 2026, construction began on February 18, 2026, and completion is scheduled for January 2027.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: economy (class IV). Floors: 5; 2 buildings, 3 entrances. Structure: frame; walls: aerated concrete blocks; facade: fiber cement board.
45 apartments: 15 one-bedroom (42–42.01 m²), 15 two-bedroom (77.47–77.47 m²), and 15 three-bedroom (95.42–95.42 m²). Ceiling height: 3.0 m. Finishing: final/turnkey.
Технический надзор — ТОО "ARS Construction Group", уполномоченная компания — ТОО «Royal BIK».
| Parameter | Value |
|---|---|
| Developer | Stroy Group Prime |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 45 |
| Permit | September 16, 2026 |
| Scheduled completion | January 2027 |
Renoir is a new development by BI Group, located in the Almaty district of Astana. Registered address: Almaty district, Akbulak-1 residential area, Amman St., plot 1/2. The permit to attract shared construction funding was issued on September 10, 2026; construction began on August 6, 2026, with scheduled completion in October 2027.
Equity holder protection scheme: involvement of a second-tier bank (funds are processed through the bank). Registry class: business (Class II). Height: 5 stories, 1 building, 4 entrances. Construction: frame, walls: brick, facade: natural stone, fiber cement panels, and aluminum composite panels.
Total apartments — 32: 2-bedroom — 1 (119.54–119.54 m²), 3-bedroom — 7 (154.57–194.63 m²), 4-bedroom — 10 (166.52–241.97 m²), 5+ bedroom — 14 (207.6–325.56 m²). Ceiling height — 3.3 m. Finishing — shell and core. Passenger elevators — 4. Parking spaces — 73.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "SAULET-4".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Business class |
| Apartments | 32 |
| Permit | September 10, 2026 |
| Scheduled completion | October 2027 |
28 объектов на 6 878 квартир: JM City Dom-Park (Каспий Құрылыс ЛТД), МЖД Юбилейный (очередь 134-135) (БК-СТРОЙ), Family Nest G (BI Group), Aiva (Comfort Telman), MERIDIAN 1 (BI Group), TAULAN (пятна 31-33) (BAZIS-A), LAVITA.CITY A (BI Group), LAVITA City-B-1 (BI Group) и другие.
The project has received approval from the local executive body to attract investment from homebuyers and has been entered into the state register of shared construction. The developer may now officially sell apartments during the construction phase via shared participation agreements.
JM City Dom-Park — KHC; MZhD Yubileyny (phase 134-135) — BVU; Family Nest G — BVU; Aiva — BVU; MERIDIAN 1 — BVU; TAULAN (plots 31-33) — BVU; LAVITA.CITY A — BVU; LAVITA City-B-1 — BVU; Riverland - 1 — BVU; Uly Dala Park — BVU. With bank participation, buyers' money goes through the bank; a KHC guarantee means the building is completed if the developer runs into trouble; an akimat permit is issued once the building's frame is up. All three schemes are provided for by law.
The earliest scheduled completion dates are: Asyl Mura (Asyl Tas), September 2026; JM City Dom-Park, December 2026; MJD Yubileyny (blocks 134-135), August 2028; Family Nest G, January 2028; Aiva, June 2027; MERIDIAN 1, July 2028; TAULAN (plots 31-33), August 2031. These dates are estimated and subject to extension by the developer.
The widest selection of layouts is typically available at the start of sales. Submit a request on Salemdom, and a broker will confirm availability and pricing, vet the developer and protection schemes via the registry, and assist you with your mortgage. Get a free double mattress when you purchase an apartment through a Salemdom broker.
From the state register of shared construction (homeportal.kz): properties that were not present in the snapshot as of August 31, 2026, and appeared by September 30, 2026. Specifications are taken from the property cards in the register.
Astana · Almaty · Shymkent · Kostanay · Konaev · Ust-Kamenogorsk · Karasay District · Semey