Сентябрь 2026 в Астане: 13 объектов получили разрешение на привлечение денег дольщиков — 3 819 квартир. Застройщики, адреса, классы, комнатность, площади и сроки ввода по госреестру.
In September 2026, 13 projects totaling 3,819 apartments were added to the shared construction registry in Astana. Sales launched for 6 developers, with BI Group offering the highest number of apartments. The list also includes Каспий Құрылыс ЛТД, Comfort Telman, BAZIS-A, TUMAR Group, and BR BUILDING.
Properties range in class from economy (Class IV) and studio apartments to business (Class II). Shared equity protection schemes are distributed as follows: BVU — 11, KZhK — 1, MIO — 1. In terms of layout, two-bedroom (39%) and three-bedroom (25%) apartments predominate. Scheduled completion dates range from December 2026 to January 2028.
At the start of sales, buyers should verify that the developer has the required permit to attract funding in the state register. It is recommended to review the chosen protection scheme, the completion deadlines, and the building's technical specifications, including wall type and finishing. Additionally, pay attention to the number of parking spaces and the technical supervision data.
Commentary prepared by Salemdom AI strictly from the issue's figures.
За сентябрь 2026 в реестр долевого строительства в Астане вошло 13 объектов на 3 819 квартир. Для покупателя это старт официальных продаж: с разрешением на привлечение денег застройщик может заключать договоры долевого участия на этапе стройки.
Funding schemes: KZhK — 1, BVU — 11, MIO — 1. Developers — 6, with BI Group offering the most apartments. Scheduled completion dates range from December 2026 to January 2028.
| ЖК | Developer | Scheme | Apartments | Scheduled completion |
|---|---|---|---|---|
| JM City Dom-Park | Kaspii Kurylis LTD | КЖК | 765 | December 2026 |
| Family Nest G | BI Group | БВУ | 534 | January 2028 |
| Aiva | Comfort Telman | БВУ | 510 | June 2027 |
| LAVITA.CITY A | BI Group | БВУ | 381 | July 2027 |
| LAVITA City-B-1 | BI Group | БВУ | 290 | November 2027 |
| Riverland - 1 | BI Group | БВУ | 284 | June 2027 |
| Uly Dala Park | TUMAR Group | БВУ | 253 | October 2027 |
| Nexpo Grand | BI Group | БВУ | 202 | January 2028 |
| Alatau Life | BR BUILDING | МИО | 189 | December 2027 |
| Aspen | BAZIS-A | БВУ | 165 | January 2028 |
| Aston Park (Plot 2) | BAZIS-A | БВУ | 119 | November 2027 |
| Tamga Hills | BI Group | БВУ | 95 | November 2027 |
| Renoir | BI Group | БВУ | 32 | October 2027 |
In new developments in Astana, two-bedroom apartments make up 39%, three-bedroom — 25%, one-bedroom — 23%, four-bedroom — 12%, and five bedrooms or more — 1% of all apartments.
| Developer | Properties | Apartments |
|---|---|---|
| BI Group | 7 | 1 818 |
| Kaspii Kurylis LTD | 1 | 765 |
| Comfort Telman | 1 | 510 |
| BAZIS-A | 2 | 284 |
| TUMAR Group | 1 | 253 |
| BR BUILDING | 1 | 189 |
JM City Dom-Park is a new development by Kaspi Kurylis LTD, located in the Nura district of Astana. Registered address: Nura district, Turan Ave, 78/2. The permit to attract shared construction funding was issued on July 3, 2024; construction began on February 15, 2021, with completion scheduled for December 2026.
Equity holder protection scheme — guaranteed by the Kazakhstan Housing Company (completion guarantee in case of developer default). Registry class — Business (Class II). Floors — 16, 1 building, 15 entrances. Structure — frame, walls — aerated concrete blocks, facade — porcelain stoneware and fiber cement panels.
Total apartments — 765: 1-bedroom — 44 (56.1–58.26 m²), 2-bedroom — 387 (75.07–84.91 m²), 3-bedroom — 156 (93.25–102.4 m²), 4-bedroom — 163 (115.01–125.93 m²), 5+ bedroom — 15 (149.46–191.17 m²). Ceiling height — 3.0 m. Finishing — pre-finish. Parking spaces — 765. As of September 30, 2026, 206 apartments have already been marked as sold in the registry.
Технический надзор — ТОО "ИНЖИНИРИНГОВАЯ КОМПАНИЯ "ЛИДЕР", уполномоченная компания — ТОО "ORTA".
| Parameter | Value |
|---|---|
| Developer | Kaspii Kurylis LTD |
| Scheme | КЖК |
| Class | Business class |
| Apartments | 765 |
| Permit | July 3, 2024 |
| Scheduled completion | December 2026 |
Family Nest G is a new project by developer BI Group, located in the Yesil district of Astana. Registered address: Yesil river, Al-Farabi Ave, plot 73. The permit to attract equity funding was issued on September 16, 2026, construction began on July 16, 2026, and completion is scheduled for January 2028.
Equity holder protection scheme: participation of a second-tier bank (funds are processed through the bank). Registry class: economy (Class IV). Storeys: 1, 2, 9; 1 building, 13 entrances. Structure: frame; walls: foam-gas concrete blocks; facade: aluminum composite panels, clinker brick.
Total apartments — 534: 1-bedroom — 125 (28.62–39.94 m²), 2-bedroom — 275 (34.51–68.12 m²), 3-bedroom — 86 (66.94–90.15 m²), 4-bedroom — 48 (94.63–135.42 m²). Ceiling height — 3.0 m. Finishing — shell and core. Parking spaces — 370. As of September 30, 2026, 183 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "PRIME DESIGN".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 534 |
| Permit | September 16, 2026 |
| Scheduled completion | January 2028 |
Aiva is a new development by Comfort Telman, located in the Sarayshyq district of Astana. Registered address: Almaty rd., A108 st., plot 12. The permit to attract equity funding was issued on September 16, 2026; construction began on July 27, 2026, with completion scheduled for June 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed through the bank). Registry class — economy (Class IV). Height — 5 and 9 stories, 1 building, 12 entrances. Structure — frame, walls — aerated concrete blocks, facade — fiber cement panels.
Apartments — 510: 1-bedroom — 213 (33.53–41.07 m²), 2-bedroom — 137 (43.65–77.69 m²), 3-bedroom — 160 (63.33–91.33 m²). Ceiling height — 2.7 m. Finish — shell and core. Passenger elevators — 12. Parking spaces — 248.
Technical supervision is provided by AI-Company NC LLP; the authorized company is PROJECT PLUS STROY LLP.
| Parameter | Value |
|---|---|
| Developer | Comfort Telman |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 510 |
| Permit | September 16, 2026 |
| Scheduled completion | June 2027 |
LAVITA.CITY A is a new development by BI Group, located in the Esil district of Astana. Registered address: Esil river, E 826 st., plot 2/1. The permit to attract equity funding was issued on September 10, 2026, construction began on July 23, 2026, and completion is scheduled for July 2027.
Equity holder protection scheme — second-tier bank participation (funds are processed through the bank). Registry class — economy (Class IV). Floors — 2, 9, 1 building, 12 entrances. Construction — frame, walls — foam concrete blocks, facade — fiber cement board.
Total apartments — 381: 1-bedroom — 107 (38.08–45.28 m²), 2-bedroom — 121 (44.44–67.49 m²), 3-bedroom — 107 (66.88–106.54 m²), 4-bedroom — 46 (105.99–122.67 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 11. Parking spaces — 254. As of September 30, 2026, 40 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "Проект Инновация".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 381 |
| Permit | September 10, 2026 |
| Scheduled completion | July 2027 |
LAVITA City-B-1 is a new development by BI Group, located in the Yesil district of Astana. Registered address: Yesil River, E 826 St, plot 2. The permit to attract equity funding was issued on September 10, 2026, construction began on July 29, 2026, with completion scheduled for November 2027.
Shareholder protection scheme: second-tier bank participation (funds are managed via the bank). Registry class: economy (Class IV). Building specifications: 9 stories, 1 building, 8 entrances. Construction: frame; walls: foam-gas concrete blocks; facade: aluminum composite panels.
Total apartments — 290: 1-bedroom — 100 (31.49–48.82 m²), 2-bedroom — 121 (44.34–66.19 m²), 3-bedroom — 61 (68.57–80.48 m²), 4-bedroom — 8 (89.64–93.11 m²). Ceiling height — 3.0 m. Finishing — shell and core. Parking spaces — 155.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "ТОRТАY еnginеering Co.".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 290 |
| Permit | September 10, 2026 |
| Scheduled completion | November 2027 |
Riverland - 1 is a new development by BI Group located in the Saryarka district of Astana. Registered address: Saryarka district, E. Serkebaev St., plot 29/1. The permit to attract equity funding was issued on September 10, 2026, construction began on August 11, 2026, and completion is scheduled for June 2027.
Shareholder protection scheme — involvement of a second-tier bank (shareholder funds are processed through the bank). Registry class — small-sized housing. Floors — 4, 9, 12; 1 building, 4 entrances. Structure — frame, walls — foam concrete blocks, facade — aluminum composite panels, ceramic brick.
Total apartments — 284: 1-bedroom — 67 (28.4–36.41 m²), 2-bedroom — 120 (33.57–55.53 m²), 3-bedroom — 63 (63.18–85.14 m²), 4-bedroom — 34 (93.57–123.21 m²). Ceiling height — 2.7 m. Finish — shell and core. Passenger elevators — 7. As of September 30, 2026, 74 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ИП "ADN Эксперт".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Compact |
| Apartments | 284 |
| Permit | September 10, 2026 |
| Scheduled completion | June 2027 |
Uly Dala Park is a new development by TUMAR Group, located in the Nura district of Astana. Registered address: Nura river, E 908 st., plot 22. The permit to attract equity funding was issued on September 16, 2026, construction began on December 31, 2025, and completion is scheduled for October 2027.
Shareholder protection scheme: participation of a second-tier bank (funds are managed via the bank). Registry class: economy (Class IV). Floors: 9, 1; 1 building, 8 entrances. Structure: frame; walls: brick; facade: fiber cement board.
Total apartments — 253: 1-bedroom — 68 (38.05–41.92 m²), 2-bedroom — 95 (49.29–72.18 m²), 3-bedroom — 58 (74.1–92.01 m²), 4-bedroom — 32 (108.98–113.13 m²). Ceiling height — 3.0 m. Finish — shell and core. Parking spaces — 93.
Технический надзор — ТОО "Adal Engineering KZ", уполномоченная компания — ТОО "ОЮ PROJECT GROUP".
| Parameter | Value |
|---|---|
| Developer | TUMAR Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 253 |
| Permit | September 16, 2026 |
| Scheduled completion | October 2027 |
Nexpo Grand is a new project by developer BI Group, located in the Yesil district of Astana. Registered address: Yesil district, T. Ryskulov St, plot 4. The permit to attract equity funding was issued on July 13, 2026, construction began on May 25, 2026, and completion is scheduled for January 2028.
Equity holder protection scheme: involvement of a second-tier bank (funds are managed via the bank). Registry class: business (Class II). Number of floors: 9, 18, 20; 1 building, 4 entrances. Construction: frame, walls: aerated concrete blocks, facade: fiber cement panels.
Total apartments — 202: 2-bedroom — 64 (53.83–84.5 m²), 3-bedroom — 70 (108.05–126.72 m²), 4-bedroom — 50 (148.54–174.36 m²), 5+ bedroom — 18 (181.83–270.59 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 8. Parking spaces — 682. As of September 30, 2026, 18 apartments are already marked as sold in the registry.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "SAULET-4".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Business class |
| Apartments | 202 |
| Permit | July 13, 2026 |
| Scheduled completion | January 2028 |
Alatau Life is a new development by BR BUILDING, located in the Nura district of Astana. Registered address: Nura district, E 435 street, 1/1, plot. The permit to attract equity funding was issued on July 28, 2026, construction began on July 15, 2026, and completion is scheduled for December 2027.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: economy (class IV). Floors: 9; 5 buildings, 6 entrances. Structure: frame; walls: aerated concrete blocks; facade: aluminum composite panels.
Total apartments — 189: 1-bedroom — 76 (37.68–44.53 m²), 2-bedroom — 57 (60.46–71.81 m²), 3-bedroom — 56 (88.66–103.01 m²). Ceiling height — 3.0 m. Finishing — pre-finish, improved shell and core. Parking spaces — 23.
Технический надзор — ТОО "TechnoService KZ", уполномоченная компания — Абжаннов Аскербек Ердикулович.
| Parameter | Value |
|---|---|
| Developer | BR BUILDING |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 189 |
| Permit | July 28, 2026 |
| Scheduled completion | December 2027 |
Aspen is a new development by BAZIS-A, located in the Yesil district of Astana. Registered address: Yesil River, E810 St, plot 2B. The permit for attracting equity holder funds was issued on September 16, 2026; construction began on June 16, 2026, with scheduled completion in January 2028.
Equity holder protection scheme — involvement of a second-tier bank (funds are processed through the bank). Registry class — economy (Class IV). Height — 6 stories, 1 building, 5 entrances. Construction — frame, walls — aerated concrete blocks, facade — composite and clinker panels.
165 apartments: 65 one-bedroom (36.13–38.72 m²), 70 two-bedroom (53.29–56.2 m²), and 30 three-bedroom (51.34–74.69 m²). Ceiling height — 2.85 m. Finishing — shell and core. 5 passenger elevators.
Технический надзор — ТОО "Трансмонтаж сервис КЗ", уполномоченная компания — ИП «ALDO».
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 165 |
| Permit | September 16, 2026 |
| Scheduled completion | January 2028 |
Aston Park (Plot 2) is a new development by BAZIS-A, located in the Yesil district of Astana. Registered address: Yesil river, E 669 st., plot 34. The permit to attract equity funding was issued on September 18, 2026, construction began on November 14, 2025, with scheduled completion in November 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed via the bank). Registry class — economy (Class IV). Storeys — 4; 1 building, 9 entrances. Construction — frame, walls — aerated concrete blocks, facade — natural stone.
Total apartments — 119: 2-bedroom — 44 (53.92–87.47 m²), 3-bedroom — 32 (115.38–136.23 m²), 4-bedroom — 40 (102.61–168.96 m²), 5+ bedroom — 3 (142.4–177.4 m²). Ceiling height — 3.3 m. Finishing — shell and core. Passenger elevators — 9. Parking spaces — 110.
Технический надзор — ТОО «ТамерланТехСервис», уполномоченная компания — ТОО "ЛидерСтройGroup".
| Parameter | Value |
|---|---|
| Developer | BAZIS-A |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 119 |
| Permit | September 18, 2026 |
| Scheduled completion | November 2027 |
Tamga Hills is a new development by BI Group, located in the Yesil district of Astana. Registered address: Yesil River, E 117 St, plot 54. The permit for equity funding was issued on June 9, 2026, construction began on December 16, 2025, and completion is scheduled for November 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed through the bank). Registry classification — economy (Class IV). Storeys — 5, 1 building, 8 entrances. Structure — frame, walls — aerated concrete blocks, facade — aluminum composite panels.
Total apartments — 95: 2-bedroom — 15 (66.97–96.49 m²), 3-bedroom — 51 (91.9–166.44 m²), 4-bedroom — 29 (148.07–176.79 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 8. Parking spaces — 69. As of September 30, 2026, 1 apartment is marked as sold in the register.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО «Astana Megapolis Project».
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 95 |
| Permit | June 9, 2026 |
| Scheduled completion | November 2027 |
Renoir is a new development by BI Group, located in the Almaty district of Astana. Registered address: Almaty district, Akbulak-1 residential area, Amman St., plot 1/2. The permit to attract shared construction funding was issued on September 10, 2026; construction began on August 6, 2026, with scheduled completion in October 2027.
Equity holder protection scheme: involvement of a second-tier bank (funds are processed through the bank). Registry class: business (Class II). Height: 5 stories, 1 building, 4 entrances. Construction: frame, walls: brick, facade: natural stone, fiber cement panels, and aluminum composite panels.
Total apartments — 32: 2-bedroom — 1 (119.54–119.54 m²), 3-bedroom — 7 (154.57–194.63 m²), 4-bedroom — 10 (166.52–241.97 m²), 5+ bedroom — 14 (207.6–325.56 m²). Ceiling height — 3.3 m. Finishing — shell and core. Passenger elevators — 4. Parking spaces — 73.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО "SAULET-4".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Business class |
| Apartments | 32 |
| Permit | September 10, 2026 |
| Scheduled completion | October 2027 |
13 объектов на 3 819 квартир: JM City Dom-Park (Каспий Құрылыс ЛТД), Family Nest G (BI Group), Aiva (Comfort Telman), LAVITA.CITY A (BI Group), LAVITA City-B-1 (BI Group), Riverland - 1 (BI Group), Uly Dala Park (TUMAR Group), Nexpo Grand (BI Group) и другие.
The project has received approval from the local executive body to attract investment from homebuyers and has been entered into the state register of shared construction. The developer may now officially sell apartments during the construction phase via shared participation agreements.
JM City Dom-Park — KHC; Family Nest G — BVU; Aiva — BVU; LAVITA.CITY A — BVU; LAVITA City-B-1 — BVU; Riverland - 1 — BVU; Uly Dala Park — BVU; Nexpo Grand — BVU; Alatau Life — MIO; Aspen — BVU. With bank participation, buyers' money passes through the bank; a KHC guarantee means the building will be completed if the developer runs into trouble; an akimat permit is issued once the building's frame is up. All three schemes are provided for by law.
The earliest scheduled completion date is JM City Dom-Park in December 2026. Scheduled dates: JM City Dom-Park — December 2026; Family Nest G — January 2028; Aiva — June 2027; LAVITA.CITY A — July 2027; LAVITA City-B-1 — November 2027; Riverland - 1 — June 2027. These dates are estimated and may be extended by the developer.
The widest selection of layouts is typically available at the start of sales. Submit a request on Salemdom, and a broker will confirm availability and pricing, vet the developer and protection schemes via the registry, and assist you with your mortgage. Get a free double mattress when you purchase an apartment through a Salemdom broker.
From the state register of shared construction (homeportal.kz): properties that were not present in the snapshot as of August 31, 2026, and appeared by September 30, 2026. Specifications are taken from the property cards in the register.
Nura District, Astana · Yesil district of Astana · Almaty District of Astana · Sarayshyq district of Astana · Saryarka district of Astana