In August 2026, 8 projects totaling 2,519 apartments were added to Astana's shared construction register. Sales launched for 5 developers: BI Group, Beles Holding, ULYTAU Group, Sensata Group, and Tengri Transit. BI Group brought the largest number of apartments to the market.

How the new objects differ

The properties are classified as Class IV small-scale housing. Completion dates are scheduled from February 2027 to March 2028. The inventory primarily consists of one-bedroom (38%) and two-bedroom (35%) apartments, with three-bedroom units accounting for 22% and four-bedroom units 5%. Regarding shareholder protection schemes, SBV (Second-Tier Banks) are involved in 6 projects, while LMA (Local Executive Bodies) are involved in 2.

What to check at the start of sales

Buyers entering the early sales phase should verify the permit for attracting equity holder funds and the fund protection scheme. It is recommended to review the technical supervision and authorized company data, as well as clarify the finishing type and the building's actual number of floors according to the registry.

Commentary prepared by Salemdom AI strictly from the issue's figures.

Key points

За август 2026 в реестр долевого строительства в Астане вошло 8 объектов на 2 519 квартир. Для покупателя это старт официальных продаж: с разрешением на привлечение денег застройщик может заключать договоры долевого участия на этапе стройки.

Schemes: MIO — 2, BVU — 6. Developers — 5, with BI Group offering the most apartments. Planned completion dates range from February 2027 to March 2028.

ЖКDeveloperSchemeApartmentsScheduled completion
Beles ParkBeles HoldingМИО426June 2027
Anyz AvenueULYTAU GroupМИО403May 2027
Alem. Dara - CBI GroupБВУ366September 2027
UIA.BIRLIK CBI GroupБВУ328March 2028
GasyrSensata GroupБВУ270March 2027
Jetisu Bereke BBI GroupБВУ250May 2027
Yrysty-2BI GroupБВУ243February 2027
ARTI 7Tengri TransitБВУ233June 2027

Which apartments go on sale

In new developments in Astana, one-bedroom apartments make up 38%, two-bedroom — 35%, three-bedroom — 22%, and four-bedroom — 5% of all units.

11-bedroom38 %960 apartments · 34.4–55.4 m²
22-bedroom35 %882 apartments · 42.6–76.4 m²
33-bedroom22 %547 apartments · 66.6–130.4 m²
44-bedroom5 %130 apartments · 93.9–162.7 m²

Developers

DeveloperPropertiesApartments
BI Group41 187
Beles Holding1426
ULYTAU Group1403
Sensata Group1270
Tengri Transit1233

New objects in detail

Beles Park

Beles Park is a new development by Beles Holding, located in the Sarayshyk district of Astana. Registered address: Sarayshyk district, Zh. Nazhimedenov St., 15/1. The permit to attract equity funding was issued on August 27, 2026; construction began on June 17, 2026, with scheduled completion in June 2027.

Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building's frame is erected). Register class: economy (class IV). Floors: 9, 16; 1 building, 5 entrances. Structure: frame; walls: aerated concrete blocks; facade: fiber-cement panels.

Total apartments — 426: 1-bedroom — 262 (35.14–40.35 m²), 2-bedroom — 102 (55.4–59.08 m²), 3-bedroom — 62 (79.57–108.2 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 1. Parking spaces — 68.

Технический надзор — ТОО «KZ AKMOL SM», уполномоченная компания — ТОО "ПНВ И К*".

ParameterValue
DeveloperBeles Holding
SchemeМИО
ClassEconomy class
Apartments426
PermitAugust 27, 2026
Scheduled completionJune 2027

Anyz Avenue

Anyz Avenue is a new development by ULYTAU Group, located in the Saryarka district of Astana. Registered address: r. Nura, ul. E 882, d. 13B. The permit to attract equity funding was issued on July 7, 2026, construction began on June 23, 2026, and completion is scheduled for May 2027.

Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building frame is erected). Register class: economy (class IV). Floors: 9, 14, 16, 17, 1 building, 7 entrances. Structure: frame, walls: foam and aerated concrete blocks, facade: fiber cement board, clinker brick.

Total apartments — 403: 1-bedroom — 102 (40.17–47.07 m²), 2-bedroom — 87 (49.51–73.5 m²), 3-bedroom — 162 (69.3–130.37 m²), 4-bedroom — 52 (112.47–162.69 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 1. Parking spaces — 204. As of August 31, 2026, 100 apartments are already marked as sold in the registry.

Технический надзор — ТОО "AstAsGroup", уполномоченная компания — ТОО "Астанатехстройэксперт".

ParameterValue
DeveloperULYTAU Group
SchemeМИО
ClassEconomy class
Apartments403
PermitJuly 7, 2026
Scheduled completionMay 2027

Alem. Dara - C

Alem. Dara - C is a new development by BI Group, located in the Nura district of Astana. Registered address: Nura river, Kazybek Bi st., plot 63. The permit to attract shared construction funding was issued on August 28, 2026; construction began on August 13, 2026, with scheduled completion in September 2027.

Equity holder protection scheme: participation of a second-tier bank (funds are processed through the bank). Registry class: economy (Class IV). Height: 9 and 14 storeys, 1 building, 6 entrances. Structure: frame, walls: foam-gas concrete blocks, facade: clinker brick.

Apartments — 366: 1-bedroom — 130 (34.41–39.92 m²), 2-bedroom — 142 (46.12–61.74 m²), 3-bedroom — 82 (68.12–90.23 m²), 4-bedroom — 12 (94.37–153.37 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 6. Parking spaces — 288.

Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО «MX-Innovation».

ParameterValue
DeveloperBI Group
SchemeБВУ
ClassEconomy class
Apartments366
PermitAugust 28, 2026
Scheduled completionSeptember 2027

UIA.BIRLIK C

UIA.BIRLIK C is a new project by developer BI Group, located in the Nura district of Astana. Registered address: Nura river, Uly Dala Ave, plot 18. The permit to attract equity funding was issued on August 28, 2026; construction began on August 14, 2026, with scheduled completion in March 2028.

Equity holder protection scheme — second-tier bank involvement (funds are processed through the bank). Registry class — economy (Class IV). Height — 9 and 17 stories, 1 building, 5 entrances. Structure — frame, walls — foam concrete blocks, facade — aluminum composite panels and clinker panels.

Total apartments — 328: 1-bedroom — 68 (34.67–40.67 m²), 2-bedroom — 144 (45.13–61.02 m²), 3-bedroom — 85 (68.79–96.69 m²), 4-bedroom — 31 (93.94–130.69 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 7. Parking spaces — 81.

Технический надзор — ТОО "Engineering Services", уполномоченная компания — ИП "ADN Эксперт".

ParameterValue
DeveloperBI Group
SchemeБВУ
ClassEconomy class
Apartments328
PermitAugust 28, 2026
Scheduled completionMarch 2028

Gasyr

Gasyr is a new development by Sensata Group, located in the Nura district of Astana. Registered address: Nura river, Uly Dala Ave, plot 7. The permit to attract equity funding was issued on September 18, 2026, construction began on December 29, 2025, and completion is scheduled for March 2027.

Shared equity protection scheme — involvement of a second-tier bank (funds are processed through the bank). Registry class — economy (Class IV). Building heights — 1, 9, and 12 stories; 1 building with 6 entrances. Structure — frame, walls — brick, facade — aluminum composite panels.

Total apartments — 270: 1-bedroom — 120 (37.29–42.31 m²), 2-bedroom — 79 (55.83–63.13 m²), 3-bedroom — 53 (76.76–83.78 m²), 4-bedroom — 18 (107.15–109.12 m²). Ceiling height — 3.0 m. Finishing — improved shell and core. Passenger elevators — 7. Parking spaces — 53.

Technical supervision is provided by BakylauTechEngineering, and the authorized company is Astana GarantStroy Project LLP.

ParameterValue
DeveloperSensata Group
SchemeБВУ
ClassEconomy class
Apartments270
PermitSeptember 18, 2026
Scheduled completionMarch 2027

Jetisu Bereke B

Jetisu Bereke B is a new development by BI Group, located in the Yesil district of Astana. Registered address: Yesil River, E 511 St, plot 32. The permit to attract shared construction funding was issued on July 28, 2026, construction began on July 15, 2026, and completion is scheduled for May 2027.

Equity holder protection scheme: involvement of a second-tier bank (funds are managed through the bank). Registry classification: small-sized housing. Building specs: 9 storeys, 1 building, 5 entrances. Construction: frame, walls: foam-gas concrete blocks, facade: aluminum composite panels.

Total apartments — 250: 1-bedroom — 33 (36.91–39.73 m²), 2-bedroom — 149 (42.62–67.34 m²), 3-bedroom — 59 (66.61–90.34 m²), 4-bedroom — 9 (116.68–117.88 m²). Ceiling height — 2.6 m. Finishing — shell and core. Passenger elevators — 5. Parking spaces — 82.

Технический надзор — ТОО "Engineering Services", уполномоченная компания — ЖОБАЛАУ-KZ.

ParameterValue
DeveloperBI Group
SchemeБВУ
ClassCompact
Apartments250
PermitJuly 28, 2026
Scheduled completionMay 2027

Yrysty-2

Yrysty-2 is a new development by BI Group, located in the Nura district of Astana. Registered address: Nura district, Kazybek bi street, plot 23. The permit to attract equity holder funds was issued on May 28, 2026, construction began on April 6, 2026, and completion is scheduled for February 2027.

Shareholder protection scheme — involvement of a second-tier bank (funds are managed through the bank). Registry class — economy (Class IV). Number of floors — 9, 12; 1 building, 4 entrances. Structure — frame, walls — expanded clay concrete, facade — aluminum composite panels.

Total apartments — 243: 1-bedroom — 143 (34.5–41.76 m²), 2-bedroom — 100 (43.19–61.3 m²). Ceiling height — 2.65 m. Finish — final. Passenger elevators — 2. Parking spaces — 268.

Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО MX-ENGINEERING.

ParameterValue
DeveloperBI Group
SchemeБВУ
ClassEconomy class
Apartments243
PermitMay 28, 2026
Scheduled completionFebruary 2027

ARTI 7

ARTI 7 is a new development by Tengri Transit, located in the Yesil district of Astana. Registered address: Yesil River, E 496 St, plot 8. The permit to attract shared construction funding was issued on July 3, 2026; construction began on December 16, 2025, with scheduled completion in June 2027.

Equity holder protection scheme — involvement of a second-tier bank (funds are processed through the bank). Registry class — economy (Class IV). Storeys — 9, 1 building, 12 entrances. Structure — frame, walls — reinforced concrete, facade — aluminum composite panels and clinker brick.

Total apartments — 233: 1-bedroom — 102 (35.69–55.4 m²), 2-bedroom — 79 (55.4–76.37 m²), 3-bedroom — 44 (70.13–91.95 m²), 4-bedroom — 8 (118.82–118.82 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 6. Parking spaces — 54.

Technical supervision is provided by Kanagat-2017 LLP; the authorized company is Shanyrak-09 LLP.

ParameterValue
DeveloperTengri Transit
SchemeБВУ
ClassEconomy class
Apartments233
PermitJuly 3, 2026
Scheduled completionJune 2027

Frequently asked questions

Which new developments in Astana went on sale in August 2026?

8 объектов на 2 519 квартир: Beles Park (Beles Holding), Anyz Avenue (ULYTAU Group), Alem. Dara - C (BI Group), UIA.BIRLIK C (BI Group), Гасыр (Sensata Group), Jetisu Bereke B (BI Group), Yrysty-2 (BI Group), ARTI 7 (Тенгри Транзит).

What does "sales start" according to the registry mean?

The project has received approval from the local executive body to attract investment from homebuyers and has been entered into the state register of shared construction. The developer may now officially sell apartments during the construction phase via shared participation agreements.

What security systems are installed in Astana's new developments?

Beles Park — MIO; Anyz Avenue — MIO; Alem. Dara - C — BVU; UIA.BIRLIK C — BVU; Gasyr — BVU; Jetisu Bereke B — BVU; Yrysty-2 — BVU; ARTI 7 — BVU. With bank participation, the money goes through the bank; a KHC guarantee means the building will be completed if the developer runs into trouble; an akimat permit is issued once the building frame has been erected. All three schemes are provided for by law.

When will the new residential complexes in Astana be completed?

The earliest scheduled completion date is Yrysty-2 in February 2027. Beles Park is set for June 2027; Anyz Avenue for May 2027; Alem. Dara - C for September 2027; UIA.BIRLIK C for March 2028; Гасыр for March 2027; and Jetisu Bereke B for May 2027. These dates are tentative and may be extended by the developer.

How to buy an apartment in a new Astana residential complex during the pre-sale phase?

The widest selection of layouts is typically available at the start of sales. Submit a request on Salemdom, and a broker will confirm availability and pricing, vet the developer and protection schemes via the registry, and assist you with your mortgage. Get a free double mattress when you purchase an apartment through a Salemdom broker.

Where does the pre-sale data come from?

From the state register of shared construction (homeportal.kz): properties that were not present in the snapshot as of July 31, 2026, and appeared by August 31, 2026. Specifications are taken from the property cards in the register.

Districts

Nura District, Astana · Yesil district of Astana · Sarayshyq district of Astana · Saryarka district of Astana

Read also

All news →