In August 2026, 17 projects totaling 3,944 apartments were added to Kazakhstan's shared construction register. Sales launched for 13 developers, with BI Group offering the highest number of apartments. Also included in the list are Beles Holding, СК Главстрой, ULYTAU Group, Sensata Group, Тенгри Транзит, Жетісу ЖҚ, KazSMU, В plus, Atamura Group, RETAIL CONSTRUCTION, СТ-77, and Aibat Construction.
The properties consist of Class IV and small-sized housing. The protection schemes are distributed as follows: BVU — 9, MIO — 8. In terms of layout, one-bedroom (41%) and two-bedroom (35%) apartments prevail, with three-bedroom units accounting for 19% and four-bedroom units for 5%. Scheduled completion dates range from October 2026 to August 2028.
When buying at the start of sales, it is important for buyers to verify that the developer has the required permit to attract equity funding in the state register. You should clarify the fund protection scheme, the actual construction start date, and the planned completion date. It is also recommended to review the technical supervision data and the authorized company details provided in the developer's documentation.
Commentary prepared by Salemdom AI strictly from the issue's figures.
За август 2026 в реестр долевого строительства в Казахстане вошло 17 объектов на 3 944 квартиры. Для покупателя это старт официальных продаж: с разрешением на привлечение денег застройщик может заключать договоры долевого участия на этапе стройки.
Schemes: MIO — 8, BVU — 9. Developers — 13, with BI Group offering the most apartments. Scheduled completion dates range from October 2026 to August 2028.
| ЖК | Developer | Scheme | Apartments | Scheduled completion |
|---|---|---|---|---|
| Beles Park | Beles Holding | МИО | 426 | June 2027 |
| Unay | Glavstroy Construction Company | БВУ | 412 | December 2026 |
| Anyz Avenue | ULYTAU Group | МИО | 403 | May 2027 |
| Alem. Dara - C | BI Group | БВУ | 366 | September 2027 |
| UIA.BIRLIK C | BI Group | БВУ | 328 | March 2028 |
| Gasyr | Sensata Group | БВУ | 270 | March 2027 |
| Jetisu Bereke B | BI Group | БВУ | 250 | May 2027 |
| Yrysty-2 | BI Group | БВУ | 243 | February 2027 |
| Arena City Life D | BI Group | БВУ | 234 | July 2028 |
| ARTI 7 | Tengri Transit | БВУ | 233 | June 2027 |
| Riviera de Luxe | Zhetisu Residential Complex | МИО | 208 | May 2027 |
| Maxima City (Phase 3) | KazSMU | БВУ | 194 | July 2027 |
| Atameken | Plus premium | МИО | 96 | October 2026 |
| Aura (Phase 3) | Atamura Group | МИО | 88 | August 2028 |
| Qonaev Breeze | RETAIL CONSTRUCTION | МИО | 76 | November 2026 |
| Satti City | СТ-77 | МИО | 69 | January 2027 |
| Orleu Park | NAK | МИО | 48 | November 2026 |
In new developments in Kazakhstan, one-bedroom apartments make up 41%, two-bedroom — 35%, three-bedroom — 19%, and four-bedroom — 5% of all units.
| Developer | Properties | Apartments |
|---|---|---|
| BI Group | 5 | 1 421 |
| Beles Holding | 1 | 426 |
| Glavstroy Construction Company | 1 | 412 |
| ULYTAU Group | 1 | 403 |
| Sensata Group | 1 | 270 |
| Tengri Transit | 1 | 233 |
| Zhetisu Residential Complex | 1 | 208 |
| KazSMU | 1 | 194 |
| Plus premium | 1 | 96 |
| Atamura Group | 1 | 88 |
| RETAIL CONSTRUCTION | 1 | 76 |
| СТ-77 | 1 | 69 |
| NAK | 1 | 48 |
Beles Park is a new development by Beles Holding, located in the Sarayshyk district of Astana. Registered address: Sarayshyk district, Zh. Nazhimedenov St., 15/1. The permit to attract equity funding was issued on August 27, 2026; construction began on June 17, 2026, with scheduled completion in June 2027.
Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building's frame is erected). Register class: economy (class IV). Floors: 9, 16; 1 building, 5 entrances. Structure: frame; walls: aerated concrete blocks; facade: fiber-cement panels.
Total apartments — 426: 1-bedroom — 262 (35.14–40.35 m²), 2-bedroom — 102 (55.4–59.08 m²), 3-bedroom — 62 (79.57–108.2 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 1. Parking spaces — 68.
Технический надзор — ТОО «KZ AKMOL SM», уполномоченная компания — ТОО "ПНВ И К*".
| Parameter | Value |
|---|---|
| Developer | Beles Holding |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 426 |
| Permit | August 27, 2026 |
| Scheduled completion | June 2027 |
Unay is a new project by developer SK Glavstroy in the Talgar district. Registered address: Talgar district, Besagash village, Novostroyka St., plot 2350. The permit to attract equity holder funds was issued on September 1, 2026, construction began on December 29, 2025, and completion is scheduled for December 2026.
Equity holder protection scheme: second-tier bank participation (funds are processed through the bank). Registry class: economy (Class IV). Floors: 5, 1 building, 15 entrances. Construction: wall system, walls: aerated concrete blocks, facade: fiber cement panels.
Total apartments — 412: 1-bedroom — 288 (35.8–49.89 m²), 2-bedroom — 104 (56.71–63.4 m²), 3-bedroom — 20 (85.16–85.16 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 1.
Технический надзор — ТОО «СтройИнжКонтроль», уполномоченная компания — ТОО "Itera Project".
| Parameter | Value |
|---|---|
| Developer | Glavstroy Construction Company |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 412 |
| Permit | September 1, 2026 |
| Scheduled completion | December 2026 |
Anyz Avenue is a new development by ULYTAU Group, located in the Saryarka district of Astana. Registered address: r. Nura, ul. E 882, d. 13B. The permit to attract equity funding was issued on July 7, 2026, construction began on June 23, 2026, and completion is scheduled for May 2027.
Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building frame is erected). Register class: economy (class IV). Floors: 9, 14, 16, 17, 1 building, 7 entrances. Structure: frame, walls: foam and aerated concrete blocks, facade: fiber cement board, clinker brick.
Total apartments — 403: 1-bedroom — 102 (40.17–47.07 m²), 2-bedroom — 87 (49.51–73.5 m²), 3-bedroom — 162 (69.3–130.37 m²), 4-bedroom — 52 (112.47–162.69 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 1. Parking spaces — 204. As of August 31, 2026, 100 apartments are already marked as sold in the registry.
Технический надзор — ТОО "AstAsGroup", уполномоченная компания — ТОО "Астанатехстройэксперт".
| Parameter | Value |
|---|---|
| Developer | ULYTAU Group |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 403 |
| Permit | July 7, 2026 |
| Scheduled completion | May 2027 |
Alem. Dara - C is a new development by BI Group, located in the Nura district of Astana. Registered address: Nura river, Kazybek Bi st., plot 63. The permit to attract shared construction funding was issued on August 28, 2026; construction began on August 13, 2026, with scheduled completion in September 2027.
Equity holder protection scheme: participation of a second-tier bank (funds are processed through the bank). Registry class: economy (Class IV). Height: 9 and 14 storeys, 1 building, 6 entrances. Structure: frame, walls: foam-gas concrete blocks, facade: clinker brick.
Apartments — 366: 1-bedroom — 130 (34.41–39.92 m²), 2-bedroom — 142 (46.12–61.74 m²), 3-bedroom — 82 (68.12–90.23 m²), 4-bedroom — 12 (94.37–153.37 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 6. Parking spaces — 288.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО «MX-Innovation».
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 366 |
| Permit | August 28, 2026 |
| Scheduled completion | September 2027 |
UIA.BIRLIK C is a new project by developer BI Group, located in the Nura district of Astana. Registered address: Nura river, Uly Dala Ave, plot 18. The permit to attract equity funding was issued on August 28, 2026; construction began on August 14, 2026, with scheduled completion in March 2028.
Equity holder protection scheme — second-tier bank involvement (funds are processed through the bank). Registry class — economy (Class IV). Height — 9 and 17 stories, 1 building, 5 entrances. Structure — frame, walls — foam concrete blocks, facade — aluminum composite panels and clinker panels.
Total apartments — 328: 1-bedroom — 68 (34.67–40.67 m²), 2-bedroom — 144 (45.13–61.02 m²), 3-bedroom — 85 (68.79–96.69 m²), 4-bedroom — 31 (93.94–130.69 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 7. Parking spaces — 81.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ИП "ADN Эксперт".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 328 |
| Permit | August 28, 2026 |
| Scheduled completion | March 2028 |
Gasyr is a new development by Sensata Group, located in the Nura district of Astana. Registered address: Nura river, Uly Dala Ave, plot 7. The permit to attract equity funding was issued on September 18, 2026, construction began on December 29, 2025, and completion is scheduled for March 2027.
Shared equity protection scheme — involvement of a second-tier bank (funds are processed through the bank). Registry class — economy (Class IV). Building heights — 1, 9, and 12 stories; 1 building with 6 entrances. Structure — frame, walls — brick, facade — aluminum composite panels.
Total apartments — 270: 1-bedroom — 120 (37.29–42.31 m²), 2-bedroom — 79 (55.83–63.13 m²), 3-bedroom — 53 (76.76–83.78 m²), 4-bedroom — 18 (107.15–109.12 m²). Ceiling height — 3.0 m. Finishing — improved shell and core. Passenger elevators — 7. Parking spaces — 53.
Technical supervision is provided by BakylauTechEngineering, and the authorized company is Astana GarantStroy Project LLP.
| Parameter | Value |
|---|---|
| Developer | Sensata Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 270 |
| Permit | September 18, 2026 |
| Scheduled completion | March 2027 |
Jetisu Bereke B is a new development by BI Group, located in the Yesil district of Astana. Registered address: Yesil River, E 511 St, plot 32. The permit to attract shared construction funding was issued on July 28, 2026, construction began on July 15, 2026, and completion is scheduled for May 2027.
Equity holder protection scheme: involvement of a second-tier bank (funds are managed through the bank). Registry classification: small-sized housing. Building specs: 9 storeys, 1 building, 5 entrances. Construction: frame, walls: foam-gas concrete blocks, facade: aluminum composite panels.
Total apartments — 250: 1-bedroom — 33 (36.91–39.73 m²), 2-bedroom — 149 (42.62–67.34 m²), 3-bedroom — 59 (66.61–90.34 m²), 4-bedroom — 9 (116.68–117.88 m²). Ceiling height — 2.6 m. Finishing — shell and core. Passenger elevators — 5. Parking spaces — 82.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ЖОБАЛАУ-KZ.
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Compact |
| Apartments | 250 |
| Permit | July 28, 2026 |
| Scheduled completion | May 2027 |
Yrysty-2 is a new development by BI Group, located in the Nura district of Astana. Registered address: Nura district, Kazybek bi street, plot 23. The permit to attract equity holder funds was issued on May 28, 2026, construction began on April 6, 2026, and completion is scheduled for February 2027.
Shareholder protection scheme — involvement of a second-tier bank (funds are managed through the bank). Registry class — economy (Class IV). Number of floors — 9, 12; 1 building, 4 entrances. Structure — frame, walls — expanded clay concrete, facade — aluminum composite panels.
Total apartments — 243: 1-bedroom — 143 (34.5–41.76 m²), 2-bedroom — 100 (43.19–61.3 m²). Ceiling height — 2.65 m. Finish — final. Passenger elevators — 2. Parking spaces — 268.
Технический надзор — ТОО "Engineering Services", уполномоченная компания — ТОО MX-ENGINEERING.
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 243 |
| Permit | May 28, 2026 |
| Scheduled completion | February 2027 |
Arena City Life D — новый объект застройщика BI Group, Алатауский район, Алматы. Адрес по реестру: р. Алатау, мкр. Ботакоз, уч. 17. Разрешение на привлечение денег дольщиков выдано 20 августа 2026, строительство начато 5 августа 2026, плановый ввод — июль 2028.
Equity holder protection scheme: second-tier bank involvement (funds are processed through the bank). Registry class: economy (Class IV). Height: 7-9 stories, 1 building, 6 entrances. Construction: frame; walls: foam concrete blocks; facade: fiber cement panels, aluminum alloy/stainless steel.
Total apartments — 234: 1-bedroom — 76 (31.48–43.52 m²), 2-bedroom — 100 (46.47–66.08 m²), 3-bedroom — 42 (69.43–105.66 m²), 4-bedroom — 16 (122.87–126.61 m²). Ceiling height — 3.0 m. Finish — pre-finishing.
Технический надзор — ТОО "ASM Gold", уполномоченная компания — ТОО "BuildControl".
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 234 |
| Permit | August 20, 2026 |
| Scheduled completion | July 2028 |
ARTI 7 is a new development by Tengri Transit, located in the Yesil district of Astana. Registered address: Yesil River, E 496 St, plot 8. The permit to attract shared construction funding was issued on July 3, 2026; construction began on December 16, 2025, with scheduled completion in June 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are processed through the bank). Registry class — economy (Class IV). Storeys — 9, 1 building, 12 entrances. Structure — frame, walls — reinforced concrete, facade — aluminum composite panels and clinker brick.
Total apartments — 233: 1-bedroom — 102 (35.69–55.4 m²), 2-bedroom — 79 (55.4–76.37 m²), 3-bedroom — 44 (70.13–91.95 m²), 4-bedroom — 8 (118.82–118.82 m²). Ceiling height — 3.0 m. Finish — shell and core. Passenger elevators — 6. Parking spaces — 54.
Technical supervision is provided by Kanagat-2017 LLP; the authorized company is Shanyrak-09 LLP.
| Parameter | Value |
|---|---|
| Developer | Tengri Transit |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 233 |
| Permit | July 3, 2026 |
| Scheduled completion | June 2027 |
Riviera de Luxe is a new development by Zhetisu ZhK in Zhezkazgan. Registered address: 1/1 Vostochno-Obyezdnaya Road. The permit to attract equity funding was issued on May 5, 2026, construction began on March 16, 2026, and completion is scheduled for May 2027.
Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building frame is erected). Register class: comfort (class III). Floors: 9, 1 building, 8 entrances. Structure: load-bearing wall system, walls: brick, facade: acrylic plaster, artificial stone.
Total apartments — 208: 1-bedroom — 76 (43.29–43.43 m²), 2-bedroom — 64 (65.68–71.69 m²), 3-bedroom — 44 (92.09–119.82 m²), 4-bedroom — 24 (127.99–154.62 m²). Ceiling height — 3.0 m. Finishing — improved shell and core. Passenger elevators — 6. Parking spaces — 74.
Технический надзор — ТОО "Developer Group", уполномоченная компания — ИП «Building project».
| Parameter | Value |
|---|---|
| Developer | Zhetisu Residential Complex |
| Scheme | МИО |
| Class | Comfort Class |
| Apartments | 208 |
| Permit | May 5, 2026 |
| Scheduled completion | May 2027 |
Maxima City (Phase 3) is a new development by KazSMU located in the Zhetysu district of Almaty. Registered address: Zhetysu district, Botkina St., plots 1/1 and 9/1. The permit to attract equity investments was issued on September 23, 2026; construction began on July 27, 2026, with completion scheduled for July 2027.
Equity holder protection scheme — involvement of a second-tier bank (funds are managed through the bank). Registry class — economy (Class IV). Building specs — 9 stories, 4 buildings, 6 entrances. Construction — frameless, walls — reinforced concrete, facade — fiber cement board.
Total apartments — 194: 1-bedroom — 79 (34.02–36.67 m²), 2-bedroom — 100 (52.39–63.24 m²), 3-bedroom — 15 (65.38–80.24 m²). Ceiling height — 2.7 m. Finishing — shell and core. Passenger elevators — 1.
Technical supervision — BATYR-SAPA KZ, authorized company — TOO ArchSpecStroyProject.
| Parameter | Value |
|---|---|
| Developer | KazSMU |
| Scheme | БВУ |
| Class | Economy class |
| Apartments | 194 |
| Permit | September 23, 2026 |
| Scheduled completion | July 2027 |
Atameken is a new development by B plus in Konaev. Registered address: 9A Soboleva St. The permit for equity funding was issued on June 9, 2026; construction began on April 30, 2026, with scheduled completion in October 2026.
Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building frame is erected). Register class: economy (class IV). Floors: 9, 3 buildings, 3 entrances. Structure: frame, walls: aerated concrete blocks, facade: fiber cement board.
Total apartments — 96: 1-bedroom — 24 (53.8–55.5 m²), 2-bedroom — 40 (54.1–75.2 m²), 3-bedroom — 8 (105.5–105.5 m²), 4-bedroom — 24 (81.6–100.9 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 1. Parking spaces — 11.
Technical supervision is provided by MSK Engineering LLP, and the authorized company is Zhoba LLP.
| Parameter | Value |
|---|---|
| Developer | Plus premium |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 96 |
| Permit | June 9, 2026 |
| Scheduled completion | October 2026 |
Аура (3 очередь) — новый объект застройщика Atamura Group, Талгарский район. Адрес по реестру: р. Талгар, с.Тузусай, ул. С. Датулы, д. 100Г. Разрешение на привлечение денег дольщиков выдано 28 июля 2026, строительство начато 31 декабря 2025, плановый ввод — август 2028.
Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building frame is erected). Register class: comfort (class III). Floors: 5, 2 buildings, 2 entrances. Structure: combined, walls: foam and aerated concrete blocks, facade: fiber cement panels.
Total apartments — 88: 1-bedroom — 28 (43.95–49.02 m²), 2-bedroom — 40 (49.33–69.02 m²), 3-bedroom — 20 (74.1–75.41 m²). Ceiling height — 2.7 m. Finishing — improved shell and core, shell and core. Passenger elevators — 1.
Технический надзор — ТОО "Экспертно-техническое бюро", уполномоченная компания — ТОО "Инновация".
| Parameter | Value |
|---|---|
| Developer | Atamura Group |
| Scheme | МИО |
| Class | Comfort Class |
| Apartments | 88 |
| Permit | July 28, 2026 |
| Scheduled completion | August 2028 |
Qonaev Breeze — новый объект застройщика RETAIL CONSTRUCTION, Конаев. Адрес по реестру: мкр. 18, ул. Ш. Уалиханова, д. 9. Разрешение на привлечение денег дольщиков выдано 8 октября 2026, строительство начато 21 августа 2026, плановый ввод — ноябрь 2026.
Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building frame is erected). Register class: economy (class IV). Floors: 5, 2 buildings, 4 entrances. Structure: frame, walls: reinforced concrete, facade: clinker panels, fiber cement panels.
76 apartments: 36 one-bedroom (39.14–47.8 m²), 18 two-bedroom (58.85–77.2 m²), and 22 three-bedroom (64.5–86.6 m²). Ceiling height: 2.9 m. Finish: shell and core.
Технический надзор — ТОО "NurAdi Company", уполномоченная компания — ТОО «ПроектПлюс».
| Parameter | Value |
|---|---|
| Developer | RETAIL CONSTRUCTION |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 76 |
| Permit | October 8, 2026 |
| Scheduled completion | November 2026 |
Satti City is a new development by ST-77 in Ust-Kamenogorsk. Registered address: 84 Esenberlin St. The permit to attract equity funding was issued on August 17, 2026; construction began on December 3, 2025, with scheduled completion in January 2027.
Buyer protection scheme: akimat permit to raise buyers' funds (issued once the building's frame is up). Register class: comfort (class III). Floors: 7; 1 building, 3 entrances. Structure: frame; walls: reinforced concrete; facade: fiber cement board.
Total apartments — 69: 1-bedroom — 15 (38.91–56.15 m²), 2-bedroom — 19 (56.15–60.79 m²), 3-bedroom — 21 (76.98–82.39 m²), 4-bedroom — 14 (96.46–115.04 m²). Ceiling height — 3.0 m. Finishing — shell and core. Passenger elevators — 3.
Технический надзор — ТОО "Жол-Dau эксперт", уполномоченная компания — ТОО "Тaxion".
| Parameter | Value |
|---|---|
| Developer | СТ-77 |
| Scheme | МИО |
| Class | Comfort Class |
| Apartments | 69 |
| Permit | August 17, 2026 |
| Scheduled completion | January 2027 |
Orleu Park is a new project by developer NAK in Talgar district. Address per the register: Talgar district, Zhana Kuat village, 28 Street, building 1009/1. The permit to raise equity holders' funds was issued on July 28, 2026, construction began on May 22, 2026, and planned completion is November 2026.
Equity holder protection scheme: akimat permit to raise equity holders' funds (issued after the building frame is erected). Register class: economy (class IV). Floors: 4 (3 floors + attic), 1 building, 2 entrances. Structure: frame, walls: thermal blocks, facade: fiber cement board.
Total apartments — 48: 32 one-bedroom (36.81–47.92 m²) and 16 two-bedroom (65.89–81.48 m²). Ceiling height — 2.7 m. Finishing — shell and core. Passenger elevators — 1. As of August 31, 2026, 1 apartment is marked as sold in the registry.
Технический надзор — ТОО "TK- Engineering", уполномоченная компания — ТОО "КазКом Контракт".
| Parameter | Value |
|---|---|
| Developer | NAK |
| Scheme | МИО |
| Class | Economy class |
| Apartments | 48 |
| Permit | July 28, 2026 |
| Scheduled completion | November 2026 |
17 объектов на 3 944 квартиры: Beles Park (Beles Holding), Unay (СК Главстрой), Anyz Avenue (ULYTAU Group), Alem. Dara - C (BI Group), UIA.BIRLIK C (BI Group), Гасыр (Sensata Group), Jetisu Bereke B (BI Group), Yrysty-2 (BI Group) и другие.
The project has received approval from the local executive body to attract investment from homebuyers and has been entered into the state register of shared construction. The developer may now officially sell apartments during the construction phase via shared participation agreements.
Beles Park: MIO; Unay: BVU; Anyz Avenue: MIO; Alem. Dara - C: BVU; UIA.BIRLIK C: BVU; Gasyr: BVU; Jetisu Bereke B: BVU; Yrysty-2: BVU; Arena City Life D: BVU; ARTI 7: BVU. With bank participation, money passes through the bank; a KHC guarantee means the project will be completed if the developer runs into trouble; an akimat permit is issued after the building frame is erected. All three schemes are provided for by law.
The earliest scheduled completion date is Atameken in October 2026. Others include Beles Park in June 2027, Unay in December 2026, Anyz Avenue in May 2027, Alem. Dara - C in September 2027, UIA.BIRLIK C in March 2028, and Gasyr in March 2027. These are estimated dates and may be subject to extension by the developer.
The widest selection of layouts is typically available at the start of sales. Submit a request on Salemdom, and a broker will confirm availability and pricing, vet the developer and protection schemes via the registry, and assist you with your mortgage. Get a free double mattress when you purchase an apartment through a Salemdom broker.
From the state register of shared construction (homeportal.kz): properties that were not present in the snapshot as of July 31, 2026, and appeared by August 31, 2026. Specifications are taken from the property cards in the register.