Standard class new development. Астана, г. Астана, р. Нұра, ул. Е 908, д. 22
In brief: Developer: TUMAR Group; register status: under construction; completion Q4 2027; equity holder protection scheme: second-tier bank (BVU) participation; 506 apartments per the register, 24% sold; register index 55/100 — developer 14.6/30, equity holder protection 25/25, location 5.6/20, timing and status 10/15, transparency 0/10.
In this selection: Residential complexes under construction in Astana per the register (39)
Register data for this complex — developer and BIN, guarantee scheme, sales progress and planned completion — on developers.kz
Uly Dala Park is a standard-class residential complex by TUMAR Group in Astana, район Нұра, ул. Е 908, д. 22. 2 buildings; 1–9 storeys; 16 entrances; structure: frame; facade: fibre-cement panels, fibre-cement boards; ceilings 3.0 m. The registry lists the complex as 2 phases (blocks), each with its own deadline and its own guarantee. Ground floors are non-residential — for shops and services. According to the registry, the complex has 506 apartments: 1-room — 136 (38 m²–41.9 m²), 2-room — 190 (47.5 m²–72.2 m²), 3-room — 116 (72.4 m²–92 m²), 4-room — 64 (109 m²–113.1 m²). On average 3.5 apartments per floor per entrance. 122 sold (24%) as of the registry's last update. Apartment finish per the registry: improved rough, rough (shell). Construction started in December 2025. Planned commissioning: Q4 2027. Construction progress per the registry: 0%. Grounds and facilities per the registry: parking for 214 car spaces (about 42 per 100 apartments); 2 guest parking spaces in the courtyard; 2 playgrounds; 2 sports grounds. Accessibility: ramps, fold-down ramps on staircases. Shared construction is carried out under the “second-tier bank participation (Bereke Bank)” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 39 and 1 more. Cadastral number of the land plot: 21-335-135-4702. Authorized company (seller under the contracts): DARIAN STROY-1, BIN 210440011687. Technical and design supervision: Adal Engineering KZ. Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 2 (nearest shop 873 m away: Small); schools and kindergartens — 3 (nearest school or kindergarten 508 m away: № 45 жалпы орта білім беретін мектеп); parks and sports grounds — 1 (nearest park or sports ground 666 m away). The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Within 1 km of the complex: 2 shops, 1 leisure spot, 3 educational facilities.
Застройщик — TUMAR Group. Юридическое лицо по реестру долевого строительства: ТОО "Алан Строй Групп", БИН 210540010632. Договоры заключает уполномоченная компания DARIAN STROY-1 (БИН 210440011687).
Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 2 buildings; 1–9 storeys; 16 entrances; structure: frame; facade: fibre-cement panels, fibre-cement boards; ceilings 3.0 m. Walls: brick. Apartment finish: improved rough, rough (shell).
Строительство начато в декабре 2025 года. Плановый срок ввода по реестру — IV квартал 2027 года. Комплекс строится. Сроки по очередям: ЖК "Uly Dala Park" — 31.10.2027; ЖК "Uly Dala Park" — 31.10.2027.
Per the registry, the complex has 506 apartments: 1-room — 136, 2-room — 190, 3-room — 116, 4-room — 64. Sizes: 1-room from 38 m² to 41.9 m², 2-room from 47.5 m² to 72.2 m², 3-room from 72.4 m² to 92 m², 4-room from 109 m² to 113.1 m². On average, 3.5 apartments per floor per entrance.
According to the registry, 122 of 506 apartments have been sold (24%). By layout: 1-room — 18%, 2-room — 27%, 3-room — 24%, 4-room — 27%. The figures are updated together with the registry: the developer reports sales itself, so they may lag behind actual sales.
Shared construction is carried out under the “second-tier bank participation (Bereke Bank)” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Cadastral number of the land plot: 21-335-135-4702. Technical supervision: Adal Engineering KZ.
Per the registry: parking for 214 car spaces (about 42 per 100 apartments); 2 guest parking spaces in the courtyard; 2 playgrounds; 2 sports grounds.
Accessibility: ramps, fold-down ramps on staircases.
Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 2 (nearest shop 873 m away: Small); schools and kindergartens — 3 (nearest school or kindergarten 508 m away: № 45 жалпы орта білім беретін мектеп); parks and sports grounds — 1 (nearest park or sports ground 666 m away). The location rating with the full list of places and distances is on the complex page.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 1370, 1482). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.