Standard class new development. Astana, Almaty district, Korday St., bldg. 85
In brief: Застройщик — TUMAR Group; статус по реестру: срок ввода наступил; срок сдачи 3 кв. 2018; схема защиты дольщиков: Гарантия АО "КЖК"; индекс ЖК по реестру 56/100 — застройщик 14.6/30, защита дольщиков 25/25, сроки и статус 5/15, прозрачность 0/10 (без учёта локации).
In this selection: Completed residential complexes in Astana per the register (228)
Алтын ұя is a standard-class residential complex by TUMAR Group in Astana, район Алматы, ул. Кордай, д. 85. 1 building; 10 storeys; structure: reinforced-concrete frame; facade: granite; ceilings 2.5 m. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in September 2017. The planned commissioning date per the registry is Q3 2018; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “Kazakhstan Housing Company (KZhK) guarantee” scheme — the project is listed in the state shared-construction registry. A KZhK guarantee means that, if the developer runs into trouble, the Kazakhstan Housing Company guarantees completion of the building. Guarantee (permit) number in the registry: ДПГ-17-01-002/003. Cadastral number of the land plot: 20-318-070-832. Authorized company (seller under the contracts): AKAN Engineering, BIN 140540020406. Technical and design supervision: Астана технадзор. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
The developer is TUMAR Group. Legal entity in the shared-construction registry: ТОО «TUMAR Group», BIN 040540018865. Contracts are concluded by the authorized company AKAN Engineering (BIN 140540020406).
Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 1 building; 10 storeys; structure: reinforced-concrete frame; facade: granite; ceilings 2.5 m. Walls: ceramic brick and aerated concrete blocks.
Construction started in September 2017. Planned commissioning date per the registry: Q3 2018. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.
Shared construction is carried out under the “Kazakhstan Housing Company (KZhK) guarantee” scheme — the project is listed in the state shared-construction registry. A KZhK guarantee means that, if the developer runs into trouble, the Kazakhstan Housing Company guarantees completion of the building. Cadastral number of the land plot: 20-318-070-832. Technical supervision: Астана технадзор.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 82). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.