Standard class new development. Астана, г. Астана, р. Алматы, ул. A108, уч. 12
In brief: Developer — AIVA Construction; registry status: under construction; completion Q2 2027; buyer protection scheme: bank participation (BVU); 510 apartments in the registry, 3% sold; registry complex index 56/100 — developer 9.7/30, buyer protection 25/25, timing and status 10/15, transparency 0/10 (excluding location).
In this selection: Residential complexes under construction in Astana per the register (44)
Salt Dastur is a standard-class residential complex by AIVA Construction in Astana, район Алматы, ул. A108, уч. 12. 1 building; 5–9 storeys; 12 entrances; structure: frame; facade: fibre-cement panels; ceilings 2.7 m. Ground floors are non-residential — for shops and services. According to the registry, the complex has 510 apartments: 1-room — 213 (33.5 m²–41.1 m²), 2-room — 137 (43.6 m²–77.7 m²), 3-room — 160 (63.3 m²–91.3 m²). On average 4.7 apartments per floor per entrance. 3% of apartments sold as of the registry's last update. Apartment finish per the registry: rough (shell). Construction started in July 2026. Planned commissioning: Q2 2027. Construction progress per the registry: 0%. Grounds and facilities per the registry: parking for 248 car spaces (about 49 per 100 apartments); 1 guest parking space in the courtyard; 1 playground; 1 sports ground; passenger lifts — 12, freight — 12. Accessibility: fold-down ramps on staircases. Shared construction is carried out under the “second-tier bank participation (Банк Bank RBK)” scheme — the project is listed in the KHC shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: KZ71PDD00004153. Cadastral number of the land plot: 21-318-145-2629. Authorized company (seller under the contracts): AIVA Terra, BIN 230940041115. Technical and design supervision: AI-Company NC. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
The developer is AIVA Construction. Legal entity in the shared-construction registry: ТОО "Comfort Telman", BIN 201240023486. Contracts are concluded by the authorized company AIVA Terra (BIN 230940041115).
Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 1 building; 5–9 storeys; 12 entrances; structure: frame; facade: fibre-cement panels; ceilings 2.7 m. Walls: aerated concrete blocks. Apartment finish: rough (shell).
Construction started in July 2026. Planned commissioning date per the registry: Q2 2027. The complex is under construction.
Per the registry, the complex has 510 apartments: 1-room — 213, 2-room — 137, 3-room — 160. Sizes: 1-room from 33.5 m² to 41.1 m², 2-room from 43.6 m² to 77.7 m², 3-room from 63.3 m² to 91.3 m². On average, 4.7 apartments per floor per entrance.
According to the registry, 3% of apartments have been sold. By layout: 1-room — 5%, 2-room — 2%. The figures are updated together with the registry: the developer reports sales itself, so they may lag behind actual sales.
Shared construction is carried out under the “second-tier bank participation (Банк Bank RBK)” scheme — the project is listed in the KHC shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Cadastral number of the land plot: 21-318-145-2629. Technical supervision: AI-Company NC.
Per the registry: parking for 248 car spaces (about 49 per 100 apartments); 1 guest parking space in the courtyard; 1 playground; 1 sports ground; passenger lifts — 12, freight — 12.
Accessibility: fold-down ramps on staircases. Lifts: 12 passenger, 12 freight.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are in the shared-construction registry of Kazakhstan Housing Company (KHC) under ID 1484. The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.
New Development Digest: Sarayshyq District, AstanaOctober 2026
New Development Digest: Sarayshyq District, AstanaSeptember 2026
Sales launches in the Saraishyk district of AstanaSeptember 2026
Astana New Developments DigestOctober 2026
Sales starts in AstanaOctober 2026
Astana New Developments DigestSeptember 2026
Sales starts in AstanaSeptember 2026
Astana New Developments DigestAugust 2026
Kazakhstan new-build digestOctober 2026