SALT

Standard class new development. Астана, г. Астана, р. Есиль, ул. Е779, уч. 32/1

No. 10 by sales in Yesil district, Astana — July 2026

In brief: Developer: AIVA Construction; register status: partially commissioned; completion Q2 2027; equity holder protection scheme: MIO permit, second-tier bank (BVU) participation; 685 apartments per the register, 6% sold; register index 52/100 — developer 9.6/30, equity holder protection 25/25, location 0/20, timing and status 10/15, transparency 7/10.

In this selection: Residential complexes under construction in Astana per the register (39)

Register data for this complex — developer and BIN, guarantee scheme, sales progress and planned completion — on developers.kz

SALT is a standard-class residential complex by AIVA Construction in Astana, район Есиль, ул. Е779, уч. 32/1. 2 buildings; 9 storeys; 21 entrances; structure: frame; facade: clinker brick, HPL panels, HPL panels; ceilings 2.8 m. The registry lists the complex as 2 phases (blocks), each with its own deadline and its own guarantee. According to the registry, the complex has 685 apartments: 1-room — 230 (35.4 m²–43.6 m²), 2-room — 236 (52.7 m²–75.6 m²), 3-room — 195 (78 m²–102.4 m²), 4-room — 24 (94.5 m²–95.5 m²). On average 3.6 apartments per floor per entrance. 39 sold (6%) as of the registry's last update. Apartment finish per the registry: rough (shell). Construction started in August 2025. Some phases have already reached their commissioning date; the last one is planned for Q2 2027. Grounds and facilities per the registry: parking for 220 car spaces (about 32 per 100 apartments); 2 guest parking spaces in the courtyard; 2 playgrounds; 2 sports grounds; bike lanes; passenger lifts — 21. Accessibility: ramps, fold-down ramps on staircases, lifts for people with limited mobility. Shared construction is carried out under the “local executive body (akimat) permit”, “second-tier bank participation (Банк Фридом Финанс Казахстан)” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction. Guarantee (permit) number in the registry: 37 and 1 more. Cadastral number of the land plot: 21-320-138-860. Authorized company (seller under the contracts): СК-AIVA, BIN 200640008938. Technical and design supervision: AI-Company NC. Within a one-kilometre radius, according to OpenStreetMap: schools and kindergartens — 1 (nearest school or kindergarten 249 m away: №108 жайлы мектеп). The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.

Within a 1 km radius of the residential complex: 1 educational facility.

FAQs

Who is the developer of SALT?

The developer is AIVA Construction. Legal entity in the shared-construction registry: ТОО «AIVA Construction», BIN 980740001481. Contracts are concluded by the authorized company СК-AIVA (BIN 200640008938).

What class is SALT, and what are its buildings like?

Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 2 buildings; 9 storeys; 21 entrances; structure: frame; facade: clinker brick, HPL panels, HPL panels; ceilings 2.8 m. Walls: SKC wall blocks. Apartment finish: rough (shell).

When will SALT be completed, and what is its status?

Строительство начато в августе 2025 года. Плановый срок ввода по реестру — II квартал 2027 года. Часть очередей уже со сроком ввода, остальные строятся. Сроки по очередям: ЖК "SALT" (2 очередь) — 11.07.2026; ЖК "Salt" — 18.05.2027.

How many apartments does SALT have, and what are the layouts?

Per the registry, the complex has 685 apartments: 1-room — 230, 2-room — 236, 3-room — 195, 4-room — 24. Sizes: 1-room from 35.4 m² to 43.6 m², 2-room from 52.7 m² to 75.6 m², 3-room from 78 m² to 102.4 m², 4-room from 94.5 m² to 95.5 m². On average, 3.6 apartments per floor per entrance.

How many apartments in SALT have been sold?

According to the registry, 39 of 685 apartments have been sold (6%). By layout: 1-room — 5%, 2-room — 3%, 3-room — 9%, 4-room — 12%. The figures are updated together with the registry: the developer reports sales itself, so they may lag behind actual sales.

How is buyers' money protected in SALT?

Shared construction is carried out under the “local executive body (akimat) permit”, “second-tier bank participation (Банк Фридом Финанс Казахстан)” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction. Cadastral number of the land plot: 21-320-138-860. Technical supervision: AI-Company NC.

Is there parking at SALT, and what is in the courtyard?

Per the registry: parking for 220 car spaces (about 32 per 100 apartments); 2 guest parking spaces in the courtyard; 2 playgrounds; 2 sports grounds; bike lanes; passenger lifts — 21.

How accessible is SALT for residents with limited mobility?

Accessibility: ramps, fold-down ramps on staircases, lifts for people with limited mobility. Lifts: 21 passenger.

What is near SALT: schools, shops, transport?

Within a one-kilometre radius, according to OpenStreetMap: schools and kindergartens — 1 (nearest school or kindergarten 249 m away: №108 жайлы мектеп). The location rating with the full list of places and distances is on the complex page.

Can I buy an apartment in SALT on Salemdom?

The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.

Where can I check SALT in the state registry?

The project's records are on the homeportal.kz portal (shared-construction registry, ID 1163, 1262). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.

SALT in market news

Similar new developments in Astana

Nearby residential complexes

More new builds in Astana

View registry data, specifications and photos →