October 2026 in Almaty: 9 projects received permission to raise buyers' funds — 1 685 apartments. Developers, addresses, classes, room counts, areas and commissioning dates according to the KHC registry.
In October 2026, 9 projects with 1 685 apartments entered the shared construction registry in Almaty. Sales started at 3 developers: Sensata Group, KazSMU and BI Group. Sensata Group brought the largest number of apartments to the market.
All 9 projects use the BVU scheme. The housing on sale is of the economy (class IV), comfort (class III) and business (class II) classes. By room count, 2-room (39 %) and 1-room (38 %) apartments predominate, 3-room account for 17 %, 4-room — 5 %, 5+-room — 1 %. Planned commissioning dates of the projects range from October 2027 to April 2028.
At the sales start, a buyer is advised to check the KHC registry data: the project address, commissioning dates, housing class and information on the authorized company and technical supervision. It is also worth paying attention to the wall construction type, ceiling height and type of finish stated in the developer’s documents.
Commentary prepared by Salemdom AI strictly from the issue's figures.
In October 2026, 9 projects with 1 685 apartments entered the shared construction registry in Almaty. For a buyer, this is the start of official sales: with a permit to attract funds, a developer can sign shared participation agreements during construction.
Schemes: BVU — 9. Developers: 3; the most apartments are from Sensata Group. Planned commissioning dates — from October 2027 to April 2028.
| Residential complex | Developer | Scheme | Apartments | Scheduled completion |
|---|---|---|---|---|
| Mangilik-5 | Sensata Group | BVU | 402 | November 2027 |
| Qaharman 2 | Sensata Group | BVU | 300 | November 2027 |
| Maxima city (phase 5) | KazSMU | BVU | 224 | October 2027 |
| TAUMURA | BI Group | BVU | 220 | April 2028 |
| Only U | BI Group | BVU | 184 | March 2028 |
| Tumanbay Moldagalyev (phase 2) | KazSMU | BVU | 110 | January 2028 |
| Tumanbay Moldagalyev (phase 1) | KazSMU | BVU | 105 | January 2028 |
| Tumanbay Moldagalyev (phase 3) | KazSMU | BVU | 70 | January 2028 |
| Tumanbay Moldagalyev (phase 4) | KazSMU | BVU | 70 | January 2028 |
In the new projects in Almaty: 2-room — 39 %, 1-room — 38 %, 3-room — 17 %, 4-room — 5 %, 5+-room — 1 % of apartments.
| Developer | Properties | Apartments |
|---|---|---|
| Sensata Group | 2 | 702 |
| KazSMU | 5 | 579 |
| BI Group | 2 | 404 |
Mangilik-5 — новый объект застройщика Sensata Group, Алмалинский район, Алматы. Адрес по реестру: р. Алмалы, ул. Ауэзова, д. ЗГ. Разрешение на привлечение денег дольщиков выдано 7 октября 2026, строительство начато 31 декабря 2025, плановый ввод — ноябрь 2027.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — economy (class IV). Floors — 12, 9 buildings, 8 entrances. Structure — load-bearing wall system, walls — brick, facade — aluminium composite panels, natural stone.
Apartments — 402: 1-room — 124 (39,43–52,66 m²), 2-room — 155 (45,68–76,96 m²), 3-room — 92 (74,21–123,7 m²), 4-room — 29 (120,85–150,81 m²), 5+-room — 2 (173,59–173,69 m²). Ceilings — 3,0 m. Finish — pre-finish. Passenger elevators — 1. As of 31 October 2026, 1 apartment is already marked as sold in the registry.
Technical supervision — LLP “Трансмонтаж сервис КЗ”, authorized company — LLP “Графен”.
| Parameter | Value |
|---|---|
| Developer | Sensata Group |
| Scheme | BVU |
| Class | Economy class |
| Apartments | 402 |
| Permit | October 7, 2026 |
| Scheduled completion | November 2027 |
Qaharman 2 — новый объект застройщика Sensata Group, Алатауский район, Алматы. Адрес по реестру: р. Алатау, мкр. Нуркент, уч. 105. Разрешение на привлечение денег дольщиков выдано 30 сентября 2026, строительство начато 24 декабря 2025, плановый ввод — ноябрь 2027.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — economy (class IV). Floors — 12, 7 buildings, 6 entrances. Structure — load-bearing wall system, walls — brick, facade — fibre cement panels.
Apartments — 300: 1-room — 126 (39,3–41,2 m²), 2-room — 76 (46,53–68,94 m²), 3-room — 76 (66,51–94,03 m²), 4-room — 22 (115,3–120,6 m²). Ceilings — 3,0 m. Finish — pre-finish. Passenger elevators — 2. As of 31 October 2026, 1 apartment is already marked as sold in the registry.
Technical supervision — LLP “Трансмонтаж сервис КЗ”, authorized company — LLP “CORPUS PRO”.
| Parameter | Value |
|---|---|
| Developer | Sensata Group |
| Scheme | BVU |
| Class | Economy class |
| Apartments | 300 |
| Permit | September 30, 2026 |
| Scheduled completion | November 2027 |
Maxima city (5 очередь) is a new project by developer KazSMU, Zhetysu District, Almaty. Registry address: Zhetysu district, Botkin St., plot 9/1. The permit to attract buyers’ funds was issued on 20 October 2026, construction started on 17 October 2026, planned commissioning — October 2027.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — economy (class IV). Floors — 9, 5 buildings, 7 entrances. Structure — frameless, walls — monolithic concrete, facade — fibre cement board.
Apartments — 224: 1-room — 102 (34,02–36,27 m²), 2-room — 114 (56,02–63,07 m²), 3-room — 8 (65,21–77,84 m²). Ceilings — 2,7 m. Finish — rough (shell). Passenger elevators — 1.
Technical supervision — BATYR-SAPA KZ, authorized company — TOO ArchSpecStroyProject.
| Parameter | Value |
|---|---|
| Developer | KazSMU |
| Scheme | BVU |
| Class | Economy class |
| Apartments | 224 |
| Permit | October 20, 2026 |
| Scheduled completion | October 2027 |
TAUMURA is a new project by developer BI Group, Auezov District, Almaty. Registry address: Auezov district, Suleimenov St., plots 33, 39. The permit to attract buyers’ funds was issued on 12 October 2026, construction started on 21 September 2026, planned commissioning — April 2028.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — comfort (class III). Floors — 6-9, 1 building, 7 entrances. Structure — frame, walls — monolithic concrete, facade — clinker brick, natural stone.
Apartments — 220: 1-room — 84 (42,13–45,92 m²), 2-room — 54 (68,73–87,48 m²), 3-room — 57 (100,42–112,51 m²), 4-room — 25 (139,93–159,45 m²). Ceilings — 3,0 m. Finish — pre-finish.
Technical supervision — ASM Gold LLP, authorized company — BuildControl LLP.
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | BVU |
| Class | Comfort Class |
| Apartments | 220 |
| Permit | 12 October 2026 |
| Scheduled completion | April 2028 |
Only U is a new project by developer BI Group, Bostandyk District, Almaty. Registry address: Bostandyk district, Ye. Serkebayev Ave., bldg 56. The permit to attract buyers’ funds was issued on 7 October 2026, construction started on 28 September 2026, planned commissioning — March 2028.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — business (class II). Floors — 9, 1 building, 6 entrances. Structure — load-bearing wall system, walls — monolithic concrete, facade — aluminium alloy/stainless steel, natural stone.
Apartments — 184: 1-room — 26 (45,97–55,41 m²), 2-room — 88 (70,01–80,88 m²), 3-room — 54 (94,45–126,89 m²), 4-room — 9 (124,21–164,62 m²), 5+-room — 7 (142,25–144,72 m²). Ceilings — 3,0 m. Finish — pre-finish.
Technical supervision — ASM Gold LLP, authorized company — BuildControl LLP.
| Parameter | Value |
|---|---|
| Developer | BI Group |
| Scheme | BVU |
| Class | Business class |
| Apartments | 184 |
| Permit | October 7, 2026 |
| Scheduled completion | March 2028 |
Tumanbay Moldagalyev (2 очередь) is a new project by developer KazSMU, Turksib District, Almaty. Registry address: Turksib district, Spartak St., plot 16. The permit to attract buyers’ funds was issued on 16 October 2026, construction started on 14 October 2026, planned commissioning — January 2028.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — economy (class IV). Floors — 5, 5 buildings, 5 entrances. Structure — combined, walls — foam/aerated concrete blocks, facade — fibre cement board.
Apartments — 110: 1-room — 58 (32,67–39,49 m²), 2-room — 52 (51,53–67,59 m²). Ceilings — 2,7 m. Finish — rough (shell). Passenger elevators — 1.
Technical supervision — BATYR-SAPA KZ, authorized company — LLP “Shvarts & Partners”.
| Parameter | Value |
|---|---|
| Developer | KazSMU |
| Scheme | BVU |
| Class | Economy class |
| Apartments | 110 |
| Permit | October 16, 2026 |
| Scheduled completion | January 2028 |
Tumanbay Moldagalyev (1 очередь) is a new project by developer KazSMU, Turksib District, Almaty. Registry address: Turksib district, Spartak St., plot 16. The permit to attract buyers’ funds was issued on 16 October 2026, construction started on 14 October 2026, planned commissioning — January 2028.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — economy (class IV). Floors — 5, 5 buildings, 5 entrances. Structure — combined, walls — reinforced concrete, facade — fibre cement board.
Apartments — 105: 1-room — 48 (32,68–39,13 m²), 2-room — 52 (51,53–67,6 m²), 3-room — 5 (85,38–86,9 m²). Ceilings — 2,7 m. Finish — rough (shell). Passenger elevators — 1.
Technical supervision — BATYR-SAPA KZ, authorized company — LLP “Shvarts & Partners”.
| Parameter | Value |
|---|---|
| Developer | KazSMU |
| Scheme | BVU |
| Class | Economy class |
| Apartments | 105 |
| Permit | October 16, 2026 |
| Scheduled completion | January 2028 |
Tumanbay Moldagalyev (3 очередь) is a new project by developer KazSMU, Turksib District, Almaty. Registry address: Turksib district, Spartak St., plot 16. The permit to attract buyers’ funds was issued on 16 October 2026, construction started on 14 October 2026, planned commissioning — January 2028.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — economy (class IV). Floors — 5, 3 buildings, 3 entrances. Structure — combined, walls — foam/aerated concrete blocks, facade — fibre cement board.
Apartments — 70: 1-room — 38 (32,67–39,49 m²), 2-room — 32 (51,61–67,59 m²). Ceilings — 2,7 m. Finish — rough (shell). Passenger elevators — 1.
Technical supervision — BATYR-SAPA KZ, authorized company — LLP “Shvarts & Partners”.
| Parameter | Value |
|---|---|
| Developer | KazSMU |
| Scheme | BVU |
| Class | Economy class |
| Apartments | 70 |
| Permit | October 16, 2026 |
| Scheduled completion | January 2028 |
Tumanbay Moldagalyev (4 очередь) is a new project by developer KazSMU, Turksib District, Almaty. Registry address: Turksib district, Spartak St., plot 16. The permit to attract buyers’ funds was issued on 16 October 2026, construction started on 14 October 2026, planned commissioning — January 2028.
Buyer protection scheme — participation of a second-tier bank (buyers’ funds pass through the bank). Registry class — economy (class IV). Floors — 5, 3 buildings, 3 entrances. Structure — combined, walls — foam/aerated concrete blocks, facade — fibre cement board.
Apartments — 70: 1-room — 38 (32,67–39,49 m²), 2-room — 32 (51,53–67,6 m²). Ceilings — 2,7 m. Finish — rough (shell). Passenger elevators — 1.
Technical supervision — BATYR-SAPA KZ, authorized company — LLP “Shvarts & Partners”.
| Parameter | Value |
|---|---|
| Developer | KazSMU |
| Scheme | BVU |
| Class | Economy class |
| Apartments | 70 |
| Permit | October 16, 2026 |
| Scheduled completion | January 2028 |
9 projects with 1 685 apartments: Mangilik-5 (Sensata Group), Qaharman 2 (Sensata Group), Maxima city (5 очередь) (KazSMU), TAUMURA (BI Group), Only U (BI Group), Tumanbay Moldagalyev (2 очередь) (KazSMU), Tumanbay Moldagalyev (1 очередь) (KazSMU), Tumanbay Moldagalyev (3 очередь) (KazSMU) and others.
The project has received approval from the local executive body to attract investment from homebuyers and has been entered into the KHC shared-construction registry. The developer may now officially sell apartments during the construction phase via shared participation agreements.
Mangilik-5 — BVU; Qaharman 2 — BVU; Maxima city (5 очередь) — BVU; TAUMURA — BVU; Only U — BVU; Tumanbay Moldagalyev (2 очередь) — BVU; Tumanbay Moldagalyev (1 очередь) — BVU; Tumanbay Moldagalyev (3 очередь) — BVU; Tumanbay Moldagalyev (4 очередь) — BVU. With bank participation, buyers’ funds pass through the bank; a KHC guarantee means the building is completed if the developer runs into problems; an akimat permit is issued after the building’s frame is erected. All three schemes are provided for by law.
Earliest planned date — Maxima city (5 очередь), October 2027. Mangilik-5 — November 2027; Qaharman 2 — November 2027; Maxima city (5 очередь) — October 2027; TAUMURA — April 2028; Only U — March 2028; Tumanbay Moldagalyev (2 очередь) — January 2028. The dates are planned; the developer may extend them.
The widest selection of layouts is typically available at the start of sales. Submit a request on Salemdom, and a broker will confirm availability and pricing, vet the developer and protection schemes via the registry, and assist you with your mortgage. Get a free double mattress when you purchase an apartment through a Salemdom broker.
From the shared-construction registry of Kazakhstan Housing Company (KHC): projects that were not in the snapshot as of 30 September 2026 and appeared by 31 October 2026. Characteristics are taken from the project cards in the registry.