Premium class new development. Astana, Almaty district, intersection of 23-8 and A. Baitursynov streets
In brief: Developer: KarStroyGroup; register status: completion date has passed; completion Q2 2024; equity holder protection scheme: second-tier bank (BVU) participation; register index 68/100 — equity holder protection 25/25, timing and status 5/15, transparency 4/10 (developer and location not included).
In this selection: Completed residential complexes in Astana per the register (228)
Golden Residence is a premium-class residential complex by KarStroyGroup in Astana, район Алматы, пересечения улиц 23-8 и А. Байтурсынова. 5–15 storeys; structure: monolithic frame; facade: fibre-cement panels; ceilings 3.3 m. Ground floors are non-residential — for shops and services. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in December 2022. The planned commissioning date per the registry is Q2 2024; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 20. Authorized company (seller under the contracts): SAMEX PLUS, BIN 100840006008. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Застройщик — KarStroyGroup. Юридическое лицо по реестру долевого строительства: ТОО "KarStroyGroup", БИН 091140005313. Договоры заключает уполномоченная компания SAMEX PLUS (БИН 100840006008).
Housing class per the registry: premium (class I under the registry classification). Building characteristics: 5–15 storeys; structure: monolithic frame; facade: fibre-cement panels; ceilings 3.3 m. Walls: aerated concrete blocks.
Construction started in December 2022. Planned commissioning date per the registry: Q2 2024. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.
Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 722). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.