New development Astana, Almaty district, Akhmet Baytursynuly St., plot No. 2
In brief: Developer: Bazis Astana; register status: completion date has passed; completion Q1 2023; equity holder protection scheme: MIO permit, second-tier bank (BVU) participation; register index 60/100 — equity holder protection 25/25, timing and status 5/15, transparency 0/10 (developer and location not included).
In this selection: Completed residential complexes in Astana per the register (228)
QAZYNA is a residential complex by Базис Астана in Astana, район Алматы, ул. Ахмет Байтұрсынұлы, уч. №2. 2 buildings; 9 storeys. The registry lists the complex as 3 phases (blocks), each with its own deadline and its own guarantee. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in April 2021. The planned commissioning date per the registry is Q1 2023; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “local executive body (akimat) permit”, “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction. Guarantee (permit) number in the registry: 30 and 2 more. Authorized company (seller under the contracts): BSK stroy, BIN 201240034104. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Застройщик — Базис Астана. Юридическое лицо по реестру долевого строительства: ТОО "Базис Астана", БИН 061040005876. Договоры заключает уполномоченная компания BSK stroy (БИН 201240034104).
Building characteristics: 2 buildings; 9 storeys.
Строительство начато в апреле 2021 года. Плановый срок ввода по реестру — I квартал 2023 года. Плановый срок уже наступил, а акт ввода в реестре не отражён — факт приёмки уточняйте у застройщика. Сроки по очередям: ЖК "QAZYNA - 3" — 19.12.2022; ЖК "QAZYNA" — 12.10.2022; ЖК "QAZYNA - 4" — 19.01.2023.
Shared construction is carried out under the “local executive body (akimat) permit”, “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 543, 264, 265). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.