Business class new build. Astana, Yesil district, Sauran St., plot No. 34
In brief: Developer: BI Group; register status: completion date has passed; completion Q2 2020; equity holder protection scheme: second-tier bank (BVU) participation; register index 72/100 — developer 23.3/30, equity holder protection 25/25, timing and status 5/15, transparency 4/10 (location not included).
In this selection: Completed residential complexes in Astana per the register (228)
Ботанический is a business-class residential complex by BI Group in Astana, район Есиль, ул. Сауран, уч. №34. 1 building; 12–20 storeys; structure: monolithic reinforced-concrete frame; ceilings 3.0 m. Ground floors are non-residential — for shops and services. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in June 2018. The planned commissioning date per the registry is Q2 2020; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 34. Authorized company (seller under the contracts): ТЭК Ресурс, BIN 060540003697. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Застройщик — BI Group. Юридическое лицо по реестру долевого строительства: ТОО "ЖАҒА НС", БИН 051240014365. Договоры заключает уполномоченная компания ТЭК Ресурс (БИН 060540003697).
Housing class per the registry: business (class II under the registry classification). Building characteristics: 1 building; 12–20 storeys; structure: monolithic reinforced-concrete frame; ceilings 3.0 m. Walls: aerated concrete blocks, brick.
Construction started in June 2018. Planned commissioning date per the registry: Q2 2020. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.
Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 26). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.