New development Astana, Yesil district, intersection of Uly Dala Ave. and Kabanbay batyra Ave.
In brief: Developer: BAZIS-A; register status: completion date has passed; completion Q2 2024; equity holder protection scheme: second-tier bank (BVU) participation; registry-based complex index 75/100 — developer 22.6/30, equity holder protection 25/25, timeline and status 5/15, transparency 7/10 (location not included).
In this selection: Completed residential complexes in Astana per the register (228)
ZANGAR is a residential complex by BAZIS-A in Astana, район Есиль, пересечение пр. Улы Дала и пр. Кабанбай батыра. 1 building; 16 storeys; structure: monolithic frame; facade: fibre-cement panels, 1 floors – natural stone; ceilings 3.0 m. Ground floors are non-residential — for shops and services. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in October 2022. The planned commissioning date per the registry is Q2 2024; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Grounds and facilities per the registry: 1 playground; 1 sports ground. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 23. Authorized company (seller under the contracts): Gefest-2021, BIN 170440035039. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Застройщик — BAZIS-A. Юридическое лицо по реестру долевого строительства: ТОО "BAZIS-A Corp.", БИН 960340000376. Договоры заключает уполномоченная компания Gefest-2021 (БИН 170440035039).
Building characteristics: 1 building; 16 storeys; structure: monolithic frame; facade: fibre-cement panels, 1 floors – natural stone; ceilings 3.0 m. Walls: aerated concrete blocks.
Construction started in October 2022. Planned commissioning date per the registry: Q2 2024. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.
Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.
Per the registry: 1 playground; 1 sports ground.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 724). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.