Premium class new development. Astana, Yesil district, intersection of Syganak and Akmeshit streets
In brief: Developer: Orda Invest; register status: completion date has passed; completion Q2 2024; equity holder protection scheme: second-tier bank (BVU) participation, local executive body (MIO / akimat) permit; 144 apartments in the register; registry-based complex index 74/100 — developer 17.2/30, equity holder protection 25/25, location 19.6/20, timeline and status 5/15, transparency 7/10.
In this selection: Completed residential complexes in Astana per the register (228)
Europe City is a premium-class residential complex by Orda Invest in Astana, район Есиль, пересечения улиц Сыганак и Акмешит. 2 buildings; 18–25 storeys; structure: monolithic, monolithic frame; facade: fibre-cement panels, fibre-cement panels, clinker brick; ceilings 3.0–3.45 m. The registry lists the complex as 3 phases (blocks), each with its own deadline and its own guarantee. Ground floors are non-residential — for shops and services. According to the registry, the complex has 144 apartments. The developer has not filled in sales data in the registry. Construction started in June 2022. The planned commissioning date per the registry is Q2 2024; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “second-tier bank participation”, “local executive body (akimat) permit” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction. Guarantee (permit) number in the registry: 3 and 2 more. Authorized company (seller under the contracts): Europe City, BIN 210740001819. Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 34 (nearest shop 234 m away: Өскен Өңір); public transport stops — 52 (nearest stop 58 m away: ЖК Номад); schools and kindergartens — 16 (nearest school or kindergarten 112 m away: ТОО Дошкольный учебно-воспитательный центр «Алпамыс»); pharmacies and clinics — 22 (nearest pharmacy or clinic 286 m away: Ойық Фарм); parks and sports grounds — 35 (nearest park or sports ground 126 m away: Сквер). The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Within 1 km of the complex: 16 educational facilities, 22 medical facilities, 34 shops, 52 public transport stops, 35 leisure spots.
Застройщик — Orda Invest. Юридическое лицо по реестру долевого строительства: ТОО "Орда строй групп", БИН 060240014641. Договоры заключает уполномоченная компания Europe City (БИН 210740001819).
Housing class per the registry: premium (class I under the registry classification). Building characteristics: 2 buildings; 18–25 storeys; structure: monolithic, monolithic frame; facade: fibre-cement panels, fibre-cement panels, clinker brick; ceilings 3.0–3.45 m. Walls: reinforced concrete.
Строительство начато в июне 2022 года. Плановый срок ввода по реестру — II квартал 2024 года. Плановый срок уже наступил, а акт ввода в реестре не отражён — факт приёмки уточняйте у застройщика. Сроки по очередям: ЖК "Europe City" (очередь 1) — 22.04.2024; ЖК "Europe City" (очередь 3) — 22.04.2024; ЖК "Europe City" (очередь 2) — 29.03.2024.
Per the registry, the complex has 144 apartments.
The developer has not filled in sales data in the registry (it shows zero), so we do not show or assess the sell-out rate.
Shared construction is carried out under the “second-tier bank participation”, “local executive body (akimat) permit” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction.
Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 34 (nearest shop 234 m away: Өскен Өңір); public transport stops — 52 (nearest stop 58 m away: ЖК Номад); schools and kindergartens — 16 (nearest school or kindergarten 112 m away: ТОО Дошкольный учебно-воспитательный центр «Алпамыс»); pharmacies and clinics — 22 (nearest pharmacy or clinic 286 m away: Ойық Фарм); parks and sports grounds — 35 (nearest park or sports ground 126 m away: Сквер). The location rating with the full list of places and distances is on the complex page.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 708, 719, 717). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.