Comfort-class new build. Astana, Yesil district, near the intersection of Kayym Mukhamedkhanov St. and Ye755 St.
In brief: Developer: BI Group; register status: completion date has passed; completion Q4 2023; equity holder protection scheme: second-tier bank (BVU) participation; register index 75/100 — developer 23.3/30, equity holder protection 25/25, timing and status 5/15, transparency 7/10 (location not included).
In this selection: Completed residential complexes in Astana per the register (228)
GreenLine. Ару Кала is a comfort-class residential complex by BI Group in Astana, район Есиль, район пересечения улиц Кайым Мухамедханова и Е755. 1 building; 9 storeys; structure: monolithic frame; facade: facade panels kmew, fibre-cement panels, clinker brick, decorative ornament; ceilings 3.0 m. The registry lists the complex as 2 phases (blocks), each with its own deadline and its own guarantee. Ground floors are non-residential — for shops and services. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in April 2021. The planned commissioning date per the registry is Q4 2023; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 28 and 1 more. Authorized company (seller under the contracts): Ғимарат НС, BIN 130740010573. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
The developer is BI Group. Legal entity in the shared-construction registry: ТОО «Nova City Development», BIN 110540015593. Contracts are concluded by the authorized company Ғимарат НС (BIN 130740010573).
Housing class per the registry: comfort (class III under the registry classification). Building characteristics: 1 building; 9 storeys; structure: monolithic frame; facade: facade panels kmew, fibre-cement panels, clinker brick, decorative ornament; ceilings 3.0 m. Walls: brick.
Строительство начато в апреле 2021 года. Плановый срок ввода по реестру — IV квартал 2023 года. Плановый срок уже наступил, а акт ввода в реестре не отражён — факт приёмки уточняйте у застройщика. Сроки по очередям: ЖК "GreenLine. Ару Кала - 2" — 17.03.2023; ЖК "GreenLine. Ару Кала - 3" — 01.10.2023.
Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 254, 625). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.