Safuan

Standard class new development. Астана, г. Астана, р. Есиль, ул. 669, уч. 27

In brief: Developer: Beles Holding; register status: completion date has passed; completion Q1 2026; equity holder protection scheme: local executive body (MIO / akimat) permit; 240 apartments in the register, 5 % sold; registry-based complex index 52/100 — developer 11.3/30, equity holder protection 25/25, timeline and status 5/15, transparency 0/10 (location not included).

In this selection: Completed residential complexes in Astana per the register (228)

Register data for this complex — developer and BIN, guarantee scheme, sales progress and planned completion — on developers.kz

Safuan is a standard-class residential complex by Beles Holding in Astana, район Есиль, ул. 669, уч. 27. 1 building; 6 storeys; 6 entrances; structure: wall system; facade: fibre-cement panels; ceilings 2.7 m. Ground floors are non-residential — for shops and services. According to the registry, the complex has 240 apartments: 1-room — 195 (31.2 m²–40.7 m²), 2-room — 35 (56.5 m²–72.1 m²), 3-room — 10 (81.1 m²–81.9 m²). On average 6.7 apartments per floor per entrance. 13 sold (5%) as of the registry's last update. Apartment finish per the registry: improved rough. Construction started in February 2025. The planned commissioning date per the registry is Q1 2026; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Grounds and facilities per the registry: 1 guest parking space in the courtyard; 1 playground; 1 sports ground; passenger lifts — 1. Accessibility: fold-down ramps on staircases. Shared construction is carried out under the “local executive body (akimat) permit” scheme — the project is listed in the state shared-construction registry. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction. Guarantee (permit) number in the registry: 17. Cadastral number of the land plot: 21-320-135-5248. Authorized company (seller under the contracts): СТРОЙДОМ88, BIN 220940010193. Technical and design supervision: RIMADA. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.

FAQs

Who is the developer of Safuan?

Застройщик — Beles Holding. Юридическое лицо по реестру долевого строительства: ТОО "Beles-M Group", БИН 041140016574. Договоры заключает уполномоченная компания СТРОЙДОМ88 (БИН 220940010193).

What class is Safuan, and what are its buildings like?

Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 1 building; 6 storeys; 6 entrances; structure: wall system; facade: fibre-cement panels; ceilings 2.7 m. Walls: foam/aerated concrete blocks. Apartment finish: improved rough.

When will Safuan be completed, and what is its status?

Construction started in February 2025. Planned commissioning date per the registry: Q1 2026. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.

How many apartments does Safuan have, and what are the layouts?

Per the registry, the complex has 240 apartments: 1-room — 195, 2-room — 35, 3-room — 10. Sizes: 1-room from 31.2 m² to 40.7 m², 2-room from 56.5 m² to 72.1 m², 3-room from 81.1 m² to 81.9 m². On average, 6.7 apartments per floor per entrance.

How many apartments in Safuan have been sold?

According to the registry, 13 of 240 apartments have been sold (5%). By layout: 1-room — 5%, 2-room — 6%, 3-room — 10%. The figures are updated together with the registry: the developer reports sales itself, so they may lag behind actual sales.

How is buyers' money protected in Safuan?

Shared construction is carried out under the “local executive body (akimat) permit” scheme — the project is listed in the state shared-construction registry. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction. Cadastral number of the land plot: 21-320-135-5248. Technical supervision: RIMADA.

Is there parking at Safuan, and what is in the courtyard?

Per the registry: 1 guest parking space in the courtyard; 1 playground; 1 sports ground; passenger lifts — 1.

How accessible is Safuan for residents with limited mobility?

Accessibility: fold-down ramps on staircases. Lifts: 1 passenger.

Are there commercial premises in Safuan?

Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.

Can I buy an apartment in Safuan on Salemdom?

The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.

Where can I check Safuan in the state registry?

The project's records are on the homeportal.kz portal (shared-construction registry, ID 1125). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.

Astana new-build market news

Similar new developments in Astana

Other residential complexes by Beles Holding in Astana

Nearby residential complexes

More new builds in Astana

View registry data, specifications and photos →