Comfort-class new build. Астана, р. Есиль, район пересечения проспекта Туран и улицы Г. Токай
In brief: Developer: Svoi Dom; register status: completion date has passed; completion Q4 2025; equity holder protection scheme: second-tier bank (BVU) participation; register index 59/100 — developer 13.2/30, equity holder protection 25/25, timing and status 5/15, transparency 4/10 (location not included).
In this selection: Completed residential complexes in Astana per the register (228)
Tandau is a comfort-class residential complex by Свой Дом in Astana, район Есиль, район пересечения проспекта Туран и улицы Токай. 1 building; 12 storeys; structure: monolithic reinforced-concrete frame; facade: fibre-cement panels, facing ceramic brick; ceilings 3.0 m. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in August 2022. The planned commissioning date per the registry is Q4 2025; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 29. Authorized company (seller under the contracts): НурАлтынОрда, BIN 200540024869. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
The developer is Свой Дом. Legal entity in the shared-construction registry: ТОО «QAZ STROY STANDART», BIN 110140012554. Contracts are concluded by the authorized company НурАлтынОрда (BIN 200540024869).
Housing class per the registry: comfort (class III under the registry classification). Building characteristics: 1 building; 12 storeys; structure: monolithic reinforced-concrete frame; facade: fibre-cement panels, facing ceramic brick; ceilings 3.0 m. Walls: aerated concrete blocks.
Construction started in August 2022. Planned commissioning date per the registry: Q4 2025. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.
Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 660). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.