Business class new build. Almaty, Bostandyk district, Abay St., bldg. 130
In brief: Developer: Tau Development; register status: completion date has passed; completion Q4 2024; buyer protection scheme: second-tier bank (BVU) participation; 288 apartments per the register; register-based complex index 77/100 — developer 20.2/30, buyer protection 25/25, location 19.6/20, timing and status 5/15, transparency 7/10.
In this selection: Completed residential complexes in Almaty per the register (82)
Abay is a residential complex (comfort, business class depending on the building) by Tau Development in Almaty, район Бостандыкский, ул. Абая, д. 130. 5 buildings; 9–12 storeys; 8 entrances; structure: monolithic frame, monolithic frame; facade: fibre-cement panels, ventilated facade — fibre-cement panels; fire-rated materials; ceilings 2.7–3.0 m. The registry lists the complex as 4 phases (blocks), each with its own deadline and its own guarantee. Ground floors are non-residential — for shops and services. According to the registry, the complex has 288 apartments. On average 4.0 apartments per floor per entrance. The developer has not filled in sales data in the registry. Apartment finish per the registry: pre-finish (white box). Construction started in August 2020. The planned commissioning date per the registry is Q4 2024; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: KZ56VWE00001171 and 3 more. Authorized company (seller under the contracts): AST Partners, BIN 160440006728. Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 45 (nearest shop 169 m away: Small); public transport stops — 61 (nearest stop 31 m away: Жандосов); schools and kindergartens — 23 (nearest school or kindergarten 263 m away: Лицей №134); pharmacies and clinics — 43 (nearest pharmacy or clinic 90 m away: Аптека 24); parks and sports grounds — 61 (nearest park or sports ground 71 m away: Technofit). The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Within 1 km of the complex: 23 educational facilities, 61 transport stops, 45 shops, 43 medical facilities, 61 leisure spots.
The developer is Tau Development. Legal entity in the shared-construction registry: ТОО «AST Investment Group», BIN 111240000745. Contracts are concluded by the authorized company AST Partners (BIN 160440006728).
Housing class per the registry: comfort, business (class III, II under the registry classification). Building characteristics: 5 buildings; 9–12 storeys; 8 entrances; structure: monolithic frame, monolithic frame; facade: fibre-cement panels, ventilated facade — fibre-cement panels; fire-rated materials; ceilings 2.7–3.0 m. Walls: aerated concrete blocks, aerated concrete blocks with mineral-wool insulation boards, aerated concrete blocks with mineral-wool insulation boards. Apartment finish: pre-finish (white box).
Строительство начато в августе 2020 года. Плановый срок ввода по реестру — IV квартал 2024 года. Плановый срок уже наступил, а акт ввода в реестре не отражён — факт приёмки уточняйте у застройщика. Сроки по очередям: ЖК "Abay" (блок 1) — 14.03.2021; ЖК "Abay - 130" (пятно 9) — 01.05.2023; ЖК "ABAY 130" (пятна 5, 7) — 20.11.2024; ЖК "ABAY 130" (пятна 4, 6) — 07.09.2024.
Per the registry, the complex has 288 apartments. On average, 4.0 apartments per floor per entrance.
The developer has not filled in sales data in the registry (it shows zero), so we do not show or assess the sell-out rate.
Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.
Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 45 (nearest shop 169 m away: Small); public transport stops — 61 (nearest stop 31 m away: Жандосов); schools and kindergartens — 23 (nearest school or kindergarten 263 m away: Лицей №134); pharmacies and clinics — 43 (nearest pharmacy or clinic 90 m away: Аптека 24); parks and sports grounds — 61 (nearest park or sports ground 71 m away: Technofit). The location rating with the full list of places and distances is on the complex page.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 285, 636, 846, 845). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.