Business class new build. Astana, Yesil district, near the intersection of Mangilik El Ave. and Enbekshiler St. and No. 25
In brief: Developer: NAK; register status: completion date has passed; completion Q4 2023; equity holder protection scheme: MIO permit; 203 apartments per the register; register index 74/100 — developer 18.8/30, equity holder protection 25/25, location 18.4/20, timing and status 5/15, transparency 7/10.
In this selection: Completed residential complexes in Astana per the register (228)
Asylym Park is a business-class residential complex by NAK in Astana, район Есиль, район пересечения пр. Мангилик Ел и ул. Еңбекшілер и №25. 1 building; 9 storeys; 10 entrances; structure: monolithic frame, monolithic frame structure; facade: fibre-cement panels, clinker brick, fibre-cement panels + clinker brick + granite, with curtain glazing glazing; ceilings 3.0 m. The registry lists the complex as 2 phases (blocks), each with its own deadline and its own guarantee. Ground floors are non-residential — for shops and services. According to the registry, the complex has 203 apartments. On average 2.3 apartments per floor per entrance. The developer has not filled in sales data in the registry. Apartment finish per the registry: pre-finish (white box). Construction started in October 2022. The planned commissioning date per the registry is Q4 2023; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Grounds and facilities per the registry: 1 playground; 1 sports ground. Shared construction is carried out under the “local executive body (akimat) permit” scheme — the project is listed in the state shared-construction registry. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction. Guarantee (permit) number in the registry: 32 and 1 more. Authorized company (seller under the contracts): Orynbor Capital Group, BIN 130740010216. Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 12 (nearest shop 459 m away: Лайм); public transport stops — 23 (nearest stop 212 m away: Қарлығаш балабақшасы); schools and kindergartens — 16 (nearest school or kindergarten 439 m away: Yumik Kids); pharmacies and clinics — 10 (nearest pharmacy or clinic 60 m away: Europharma); parks and sports grounds — 13 (nearest park or sports ground 415 m away: Президент саябағы). The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Within 1 km of the complex: 12 shops, 10 medical facilities, 23 public transport stops, 16 educational facilities, 13 leisure venues.
Застройщик — NAK. Юридическое лицо по реестру долевого строительства: ТОО "Нұр Астана Құрылыс", БИН 060140000846. Договоры заключает уполномоченная компания Orynbor Capital Group (БИН 130740010216).
Housing class per the registry: business (class II under the registry classification). Building characteristics: 1 building; 9 storeys; 10 entrances; structure: monolithic frame, monolithic frame structure; facade: fibre-cement panels, clinker brick, fibre-cement panels + clinker brick + granite, with curtain glazing glazing; ceilings 3.0 m. Walls: aerated concrete blocks, aerated concrete blocks (outside monolithic, inside aerated concrete). Apartment finish: pre-finish (white box).
Строительство начато в октябре 2022 года. Плановый срок ввода по реестру — IV квартал 2023 года. Плановый срок уже наступил, а акт ввода в реестре не отражён — факт приёмки уточняйте у застройщика. Сроки по очередям: МЖК "Asylym Park - 1" (очередь 2) — 07.10.2023; МЖК "Asylym Park - 1" (очередь 1) — 08.07.2023.
Per the registry, the complex has 203 apartments. On average, 2.3 apartments per floor per entrance.
The developer has not filled in sales data in the registry (it shows zero), so we do not show or assess the sell-out rate.
Shared construction is carried out under the “local executive body (akimat) permit” scheme — the project is listed in the state shared-construction registry. An akimat permit is issued once part of the frame has been built with the developer's own funds and the developer has confirmed its track record and own capital; the project is supervised by the akimat and the state register of shared-equity construction.
Per the registry: 1 playground; 1 sports ground.
Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 12 (nearest shop 459 m away: Лайм); public transport stops — 23 (nearest stop 212 m away: Қарлығаш балабақшасы); schools and kindergartens — 16 (nearest school or kindergarten 439 m away: Yumik Kids); pharmacies and clinics — 10 (nearest pharmacy or clinic 60 m away: Europharma); parks and sports grounds — 13 (nearest park or sports ground 415 m away: Президент саябағы). The location rating with the full list of places and distances is on the complex page.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 780, 831). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.