Shabyt

Comfort-class new build. Астана, р. Есиль, ул. Орынбор, между проспектами Туран и Кабанбай батыра

In brief: Developer: BI Group; register status: completion date has passed; completion Q3 2023; equity holder protection scheme: second-tier bank (BVU) participation; register-based complex index 75/100 — developer 23.3/30, equity holder protection 25/25, timing and status 5/15, transparency 7/10 (excluding location).

In this selection: Completed residential complexes in Astana per the register (228)

Shabyt is a comfort-class residential complex by BI Group in Astana, район Есиль, ул. Орынбор, между проспектами Туран и Кабанбай батыра. 20 storeys; structure: monolithic reinforced concrete; facade: ventilated facade; ceilings 3.0 m. Ground floors are non-residential — for shops and services. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in April 2021. The planned commissioning date per the registry is Q3 2023; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 17. Authorized company (seller under the contracts): Арнау City, BIN 170440002678. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.

FAQs

Who is the developer of Shabyt?

Застройщик — BI Group. Юридическое лицо по реестру долевого строительства: ТОО "BI Development Astana", БИН 130940009587. Договоры заключает уполномоченная компания Арнау City (БИН 170440002678).

What class is Shabyt, and what are its buildings like?

Housing class per the registry: comfort (class III under the registry classification). Building characteristics: 20 storeys; structure: monolithic reinforced concrete; facade: ventilated facade; ceilings 3.0 m. Walls: aerated concrete blocks.

When will Shabyt be completed, and what is its status?

Construction started in April 2021. Planned commissioning date per the registry: Q3 2023. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.

How is buyers' money protected in Shabyt?

Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.

Are there commercial premises in Shabyt?

Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.

Can I buy an apartment in Shabyt on Salemdom?

The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.

Where can I check Shabyt in the state registry?

The project's records are on the homeportal.kz portal (shared-construction registry, ID 570). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.

Astana new-build market news

This residential complex is featured in collections

Comfort class

Similar new developments in Astana

Other residential complexes by BI Group in Astana

Nearby residential complexes

More new builds in Astana

View registry data, specifications and photos →