Business class new build. Shymkent, Al-Farabi River, Baidibek Bi Ave, plot 113
In brief: Developer: BI Group; register status: commissioned; completion Q4 2025; equity holder protection scheme: second-tier bank (BVU) participation; 711 apartments per the register, 36% sold; register index 88/100 — developer 23.3/30, equity holder protection 25/25, timing and status 15/15, transparency 7/10 (location not included).
In this selection: Completed complexes in Shymkent per the register (37)
Atamura Business 1 is a residential complex (business, comfort, standard class depending on the building) by BI Group in Shymkent, район Аль-Фараби, пр. Байдибек Би, уч. 113. 2 buildings; 9–12 storeys; 17 entrances; structure: monolithic reinforced concrete, wall system; facade: ventilated curtain-wall facade, clinker boards on first and last floors, curtain-wall ventilated facade, decorative render with side courtyard, floors, clinker boards on the first floors; ceilings 2.7 m. The registry lists the complex as 3 phases (blocks), each with its own deadline and its own guarantee. Ground floors are non-residential — for shops and services. According to the registry, the complex has 711 apartments: 1-room — 38 (35.4 m²–42.7 m²), 2-room — 165 (41.1 m²–66.9 m²), 3-room — 60 (42 m²–87.4 m²), 4-room — 24 (106.3 m²–113 m²). On average 3.8 apartments per floor per entrance. 255 sold (36%) as of the registry's last update. Apartment finish per the registry: pre-finish (white box), rough (shell). Construction started in April 2021. The complex has been commissioned — certificate dated October 14, 2025. Grounds and facilities per the registry: parking for 76 car spaces (about 11 per 100 apartments); 1 guest parking space in the courtyard; 3 playgrounds; 2 sports grounds; bike lanes; passenger lifts — 1, freight — 1. Accessibility: ramps. Shared construction is carried out under the “second-tier bank participation (Банк Bank RBK)” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 18 and 2 more. Cadastral number of the land plot: 22-327-030-243. Authorized company (seller under the contracts): Жас НС, BIN 210340005460. Technical and design supervision: Engineering Services. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
Застройщик — BI Group. Юридическое лицо по реестру долевого строительства: ТОО "BI Development Astana", БИН 130940009587. Всего в реестре по комплексу 2 юрлица застройщика (по разным очередям). Договоры заключает уполномоченная компания Жас НС (БИН 210340005460).
Housing class per the registry: business, comfort, standard (class II, III, IV under the registry classification). Building characteristics: 2 buildings; 9–12 storeys; 17 entrances; structure: monolithic reinforced concrete, wall system; facade: ventilated curtain-wall facade, clinker boards on first and last floors, curtain-wall ventilated facade, decorative render with side courtyard, floors, clinker boards on the first floors; ceilings 2.7 m. Walls: monolithic and aerated concrete blocks, aerated concrete blocks, interior partitions plasterboard, foam/aerated concrete blocks. Apartment finish: pre-finish (white box), rough (shell).
Строительство начато в апреле 2021 года. По реестру объект введён в эксплуатацию — акт от 14 октября 2025 года. Сроки по очередям: ЖК "Atamura Business 1" — 10.08.2023; ЖК "Atamura Comfort 1-1" — 01.02.2025; ЖК "Atamura Comfort 2" (очередь 2) — 29.10.2025.
Per the registry, the complex has 711 apartments: 1-room — 38, 2-room — 165, 3-room — 60, 4-room — 24. Sizes: 1-room from 35.4 m² to 42.7 m², 2-room from 41.1 m² to 66.9 m², 3-room from 42 m² to 87.4 m², 4-room from 106.3 m² to 113 m². On average, 3.8 apartments per floor per entrance.
According to the registry, 255 of 711 apartments have been sold (36%). By layout: 1-room — 79%, 2-room — 89%, 3-room — 92%, 4-room — 96%. The figures are updated together with the registry: the developer reports sales itself, so they may lag behind actual sales.
Shared construction is carried out under the “second-tier bank participation (Банк Bank RBK)” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Cadastral number of the land plot: 22-327-030-243. Technical supervision: Engineering Services.
Per the registry: parking for 76 car spaces (about 11 per 100 apartments); 1 guest parking space in the courtyard; 3 playgrounds; 2 sports grounds; bike lanes; passenger lifts — 1, freight — 1.
Accessibility: ramps. Lifts: 1 passenger, 1 freight.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 231, 800, 1000). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.