Standard class new development. Шымкент, г.Шымкент, Абайский район, микрорайон Шымсити, д. б/н
In brief: Developer: Otau-Stroy; register status: under construction; completion Q2 2027; equity holder protection scheme: second-tier bank (BVU) participation; 500 apartments per the register; register index 84/100 — equity holder protection 25/25, timing and status 10/15, transparency 7/10 (developer and location not included).
In this selection: Complexes under construction in Shymkent per the register (16)
Register data for this complex — developer and BIN, guarantee scheme, sales progress and planned completion — on developers.kz
BAIDIBEK is a standard-class residential complex by Отау-Строй in Shymkent, Абайский район, микрорайон Шымсити, д. б/н. 1 building; 14 storeys; 5 entrances; structure: frame; facade: aluminium composite panels; ceilings 3.0 m. Ground floors are non-residential — for shops and services. According to the registry, the complex has 500 apartments: 1-room — 100 (50.1 m²–51.2 m²), 2-room — 222 (60.5 m²–66.8 m²), 3-room — 178 (65.9 m²–111.3 m²). On average 7.1 apartments per floor per entrance. The developer has not filled in sales data in the registry. Apartment finish per the registry: improved rough. Construction started in March 2026. Planned commissioning: Q2 2027. Construction progress per the registry: 0%. Grounds and facilities per the registry: 1 guest parking space in the courtyard; 1 playground; 1 sports ground; bike lanes; passenger lifts — 9, freight — 9. Accessibility: ramps, fold-down ramps on staircases. Shared construction is carried out under the “second-tier bank participation (Банк Фридом Финанс Казахстан)” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 111. Cadastral number of the land plot: 22-327-029-266. Authorized company (seller under the contracts): DASTYR, BIN 071140015531. Technical and design supervision: ИНВЕКОН ИНЖИНИРИНГ. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
The developer is Отау-Строй. Legal entity in the shared-construction registry: ТОО «Отау-Строй», BIN 040140001989. Contracts are concluded by the authorized company DASTYR (BIN 071140015531).
Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 1 building; 14 storeys; 5 entrances; structure: frame; facade: aluminium composite panels; ceilings 3.0 m. Walls: foam/aerated concrete blocks. Apartment finish: improved rough.
Construction started in March 2026. Planned commissioning date per the registry: Q2 2027. The complex is under construction.
Per the registry, the complex has 500 apartments: 1-room — 100, 2-room — 222, 3-room — 178. Sizes: 1-room from 50.1 m² to 51.2 m², 2-room from 60.5 m² to 66.8 m², 3-room from 65.9 m² to 111.3 m². On average, 7.1 apartments per floor per entrance.
The developer has not filled in sales data in the registry (it shows zero), so we do not show or assess the sell-out rate.
Shared construction is carried out under the “second-tier bank participation (Банк Фридом Финанс Казахстан)” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Cadastral number of the land plot: 22-327-029-266. Technical supervision: ИНВЕКОН ИНЖИНИРИНГ.
Per the registry: 1 guest parking space in the courtyard; 1 playground; 1 sports ground; bike lanes; passenger lifts — 9, freight — 9.
Accessibility: ramps, fold-down ramps on staircases. Lifts: 9 passenger, 9 freight.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 1411). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.
Abay District · Standard class · Standard class, Abai district · Escrow account, Abay district · Completion 2027, Abay district