Comfort-class new build. Astana, Yesil district, intersection of Kerey, Zhanibek Khandar, Bukhar Zhyrau, No. 37 and No. 38 streets
In brief: Developer: BI Group; register status: completion date has passed; completion Q2 2023; equity holder protection scheme: second-tier bank (BVU) participation; register-based complex index 75/100 — developer 23.3/30, equity holder protection 25/25, timing and status 5/15, transparency 7/10 (excluding location).
In this selection: Completed residential complexes in Astana per the register (228)
Capital Park 3E is a comfort-class residential complex by BI Group in Astana, район Есиль, пересечение улиц Керей, Жанибек хандар, Букар Жырау, № 37 и № 38. 1 building; 12 storeys; structure: monolithic reinforced concrete; facade: ventilated facade; ceilings 2.7–3.0 m. Ground floors are non-residential — for shops and services. The developer has not disclosed the number and sizes of apartments in the registry. Construction started in December 2020. The planned commissioning date per the registry is Q2 2023; that date has passed, but no commissioning certificate is recorded in the registry — check the acceptance status with the developer. Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds. Guarantee (permit) number in the registry: 15. Authorized company (seller under the contracts): ИсМи, BIN 030440016977. Infrastructure within a kilometre is still sparse — the area is under development. The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.
The developer is BI Group. Legal entity in the shared-construction registry: ТОО «Nova City Development», BIN 110540015593. Contracts are concluded by the authorized company ИсМи (BIN 030440016977).
Housing class per the registry: comfort (class III under the registry classification). Building characteristics: 1 building; 12 storeys; structure: monolithic reinforced concrete; facade: ventilated facade; ceilings 2.7–3.0 m. Walls: aerated concrete blocks.
Construction started in December 2020. Planned commissioning date per the registry: Q2 2023. The planned date has passed, but no commissioning certificate is recorded in the registry — confirm acceptance with the developer.
Shared construction is carried out under the “second-tier bank participation” scheme — the project is listed in the state shared-construction registry. With bank participation, buyers' money passes through a second-tier bank, which controls how it is spent as construction proceeds.
Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.
The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.
The project's records are on the homeportal.kz portal (shared-construction registry, ID 243). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.