ULAGAT

Standard class new development. Астана, г.Астана, район Нұра, улица шос. Коргалжын, участок 40Б

No. 4 by sales in Astana — August 2026No. 1 by sales in Nura district, Astana — August 2026Sales launch — July 2026

In brief: Застройщик — Stroy Opt; статус по реестру: строится; срок сдачи 4 кв. 2027; схема защиты дольщиков: Гарантия АО "КЖК"; 204 квартир по реестру, продано 36 %; индекс ЖК по реестру 65/100 — застройщик 16.4/30, защита дольщиков 25/25, локация 7.2/20, сроки и статус 10/15, прозрачность 6/10.

In this selection: Residential complexes under construction in Astana per the register (39)

Register data for this complex — developer and BIN, guarantee scheme, sales progress and planned completion — on developers.kz

ULAGAT is a standard-class residential complex by Stroy Opt in Astana, район Нұра, улица шос. Коргалжын, участок 40Б. 1 building; 5 storeys; 11 entrances; structure: frame; facade: fibre-cement panels; ceilings 2.7 m. Ground floors are non-residential — for shops and services. According to the registry, the complex has 204 apartments: 1-room — 82 (34.3 m²–48.9 m²), 2-room — 106 (49.9 m²–74.2 m²), 3-room — 16 (56.5 m²–93.4 m²). On average 3.7 apartments per floor per entrance. 74 sold (36%) as of the registry's last update. Apartment finish per the registry: rough (shell). Construction started in May 2026. Planned commissioning: Q4 2027. Construction progress per the registry: 0%. Grounds and facilities per the registry: 1 guest parking space in the courtyard; 1 playground; 1 sports ground; passenger lifts — 1. Accessibility: ramps, fold-down ramps on staircases. Shared construction is carried out under the “Kazakhstan Housing Company (KZhK) guarantee” scheme — the project is listed in the state shared-construction registry. A KZhK guarantee means that, if the developer runs into trouble, the Kazakhstan Housing Company guarantees completion of the building. Guarantee (permit) number in the registry: ДПГ-26-01-084/218. Cadastral number of the land plot: 21-335-141-918. Authorized company (seller under the contracts): Даму Кұрылыс 2015, BIN 150440001041. Technical and design supervision: AstAsGroup. The Kazakhstan Housing Company publishes construction monitoring reports for this project. Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 1 (nearest shop 650 m away: Greenwich); public transport stops — 8 (nearest stop 365 m away); schools and kindergartens — 2 (nearest school or kindergarten 271 m away: Қайым Мұхамедханов атындағы №90 гимназия). The developer does not publish apartment listings for this complex on Salemdom — leave a request on this page and we will check availability and prices with the developer.

Within 1 km of the complex: 1 shop, 8 public transport stops, 2 educational facilities.

FAQs

Who is the developer of ULAGAT?

Застройщик — Stroy Opt. Юридическое лицо по реестру долевого строительства: ТОО "Stroy Opt", БИН 131240018048. Договоры заключает уполномоченная компания Даму Кұрылыс 2015 (БИН 150440001041).

What class is ULAGAT, and what are its buildings like?

Housing class per the registry: standard (class IV under the registry classification). Building characteristics: 1 building; 5 storeys; 11 entrances; structure: frame; facade: fibre-cement panels; ceilings 2.7 m. Walls: foam/aerated concrete blocks. Apartment finish: rough (shell).

When will ULAGAT be completed, and what is its status?

Construction started in May 2026. Planned commissioning date per the registry: Q4 2027. The complex is under construction.

How many apartments does ULAGAT have, and what are the layouts?

Per the registry, the complex has 204 apartments: 1-room — 82, 2-room — 106, 3-room — 16. Sizes: 1-room from 34.3 m² to 48.9 m², 2-room from 49.9 m² to 74.2 m², 3-room from 56.5 m² to 93.4 m². On average, 3.7 apartments per floor per entrance.

How many apartments in ULAGAT have been sold?

According to the registry, 74 of 204 apartments have been sold (36%). By layout: 1-room — 52%, 2-room — 25%, 3-room — 31%. The figures are updated together with the registry: the developer reports sales itself, so they may lag behind actual sales.

How is buyers' money protected in ULAGAT?

Shared construction is carried out under the “Kazakhstan Housing Company (KZhK) guarantee” scheme — the project is listed in the state shared-construction registry. A KZhK guarantee means that, if the developer runs into trouble, the Kazakhstan Housing Company guarantees completion of the building. Cadastral number of the land plot: 21-335-141-918. Technical supervision: AstAsGroup. KZhK monitoring reports are available for this project.

Is there parking at ULAGAT, and what is in the courtyard?

Per the registry: 1 guest parking space in the courtyard; 1 playground; 1 sports ground; passenger lifts — 1.

How accessible is ULAGAT for residents with limited mobility?

Accessibility: ramps, fold-down ramps on staircases. Lifts: 1 passenger.

What is near ULAGAT: schools, shops, transport?

Within a one-kilometre radius, according to OpenStreetMap: shops and supermarkets — 1 (nearest shop 650 m away: Greenwich); public transport stops — 8 (nearest stop 365 m away); schools and kindergartens — 2 (nearest school or kindergarten 271 m away: Қайым Мұхамедханов атындағы №90 гимназия). The location rating with the full list of places and distances is on the complex page.

Are there commercial premises in ULAGAT?

Yes, per the registry the ground floors are non-residential — for shops, services and offices. This is convenient for residents, but second-floor apartments above commercial units deserve a closer look for noise.

Can I buy an apartment in ULAGAT on Salemdom?

The developer does not publish apartment listings for this complex on Salemdom. Leave a request on the complex page — we will check availability, prices and terms with the developer. If the complex has been commissioned, apartments may also be sold on the secondary market.

Where can I check ULAGAT in the state registry?

The project's records are on the homeportal.kz portal (shared-construction registry, ID 1441). The data on this page is compiled from them automatically and updated together with the registry; before signing, compare the developer's BIN and the guarantee number in your contract with the registry.

ULAGAT in market news

This residential complex is featured in collections

Nura district · Left Bank · Completion in 2027, Nura district

Similar new developments in Astana

Other residential complexes by Stroy Opt in Astana

Nearby residential complexes

More new builds in Astana

View registry data, specifications and photos →